ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
2. Development authorised by this approval must be undertaken generally in
accordance with the Approved Plans listed within this Decision Notice.
Prior to Commencement of Works
3. Council must be contacted at least 5 working days prior to any works
commencing to organise a prestart. The contact number to arrange a pre-start
meeting is 5329 6244. The pre-start meeting must include the relevant parties
for the following aspects of the works:
a. Civil engineering works;
b. Erosion and sediment control works
4. A Construction Management Plan must be submitted to Council prior to the pre-
start meeting and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including:
i. A Traffic Management Control Plan in accordance with Manual of
Uniform Traffic Control Devices (MUTCD) detailing all temporary
signage and traffic control measures prior to construction
ii. Maintenance of safe pedestrian access across the frontage of the
site both during daily construction and after daily construction has
ceased
iii. Proposed fencing to the site during the construction phase of the
development
iv. Adequate parking arrangements for construction workers
b. Maintenance and protection of water quality and existing drainage lines
through the construction site through the implementation of appropriate
erosion and sediment control measures
c. Works programme identifying key components of the works and their
respective durations
d. Establishment of a communication protocol with the general public,
adjoining owners, emergency services and local businesses to advise of
agreed construction times, impacts on traffic and services and other
relevant issues
5. Any conflict between the development and an existing or proposed service
must be referred to the relevant service authority for determination prior to
commencement of works.
During Construction
6. The developer must meet any costs to repair damage to any Council asset
during construction, where damage is a result of the development works.
Damage to assets must be repaired immediately where it creates a hazard to
the community. In circumstances where the damage does not create a hazard
to the community, it must be repaired immediately on completion of the works
associated with the development. A condition report including photographs of
the frontage of the site should be completed and submitted to Council at the
prestart meeting or prior to any works commencing (where no prestart meeting
is to occur).
Page 12 of 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.