Original source · versioned page text
2014-09-25 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 25 SEPTEMBER 2014
28. Turf (verge): The applicant must ensure turf is in accordance with the following:
a. Turf species to be sustainable for local and design conditions without
requiring irrigation.
b. Turf is easily accessible and navigable by ride-on mowers with cutting
decks of 2.1 metres wide.
c. Be free of rocks and debris.
d. Turf is rolled and joined smoothly and level with adjoining surfaces.
e. Turf is pest, weed and disease free.
Following Construction
29. Ongoing maintenance: The site must be maintained to aesthetically compliment
the surrounding local area for the life of the development. The maintenance
must include:
a. Regular mowing, weeding and fertilising of turf verge.
b. Replenishing of mulch to 100mm depth, fertilising and aeration of
landscape areas.
c. Cleaning of all external surfaces including prompt removal of graffiti.
d. Replacement of dead or poorly performing plants.
e. Inspection and assessment of all vegetation such that it does not
adversely affect adjoining property or pedestrians.
f. Remedial action if any vegetation poses a health or safety risk to site
users or adjoining property.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
UNITYWATER
During Construction
30. Water meters must be installed to each lot of the development in accordance
with Unitywater requirements and SEQ Standard Drawings.
31. Electrical pillars must be located on alternative boundaries to water meters.
32. A minimum horizontal clearance of 1.0 metre must be maintained between
stormwater pipes greater than 225mm diameter and Unitywater water supply or
sewerage infrastructure.
33. Stormwater filtration/retention systems and gross pollutant traps must maintain
a minimum of 1.5 metres horizontal clearance from a sewerage main or sewer
house connection point.
34. A minimum of 0.5 metres separation must be maintained between the
outermost edge of sewer access chambers or sewerage mains and the
property boundary.
35. Easements of between 3 and 10 metres must be provided over all Unitywater
sewers located within property boundaries in accordance with the SEQ
standards. Easements shall be centred over the pipe. Easement terms shall be
the most current registered dealing held by the Department of Natural
Resources & Mines and shall not be altered or amended.
Page 16 of 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.