Appendix J - Civil Engineering Report and SBSMP
Noosa Residential Development
Ref: 24553 C R002 REV03 10.08.21.docx
August 2021
Detailed design and documentation of the OSD will be carried out once the development application
has been approved by Council. Refer to Appendix C for the conceptual stormwater drainage layout
and details.
6.4 Peak Storm Results
A comparison between the peak discharge values between each of the XP-STORM modelled
scenarios is presented in Table 4.
Table 4 – XP-STORM Modelling Peak Storm Mitigation Results (Free Outlet)
Design Pre-Development Post-Development Post-Development Flow change from
Storm Flows Flows, Unmitigated Flows, Mitigated Pre-Development
(AEP) (m3/s) (m3/s) (m3/s) (m3/s)
39% 0.177 0.282 0.170 -3.95%
20% 0.275 0.359 0.256 -6.91%
10% 0.325 0.490 0.326 0.31%
5% 0.402 0.578 0.391 -2.74%
2% 0.707 0.712 0.644 -8.91%
1% 0.807 0.812 0.744 -7.81%
Table 5 – XP-STORM Modelling Peak Storm Mitigation Results (Full Open Channel at LPD)
Design Pre-Development Post-Development Post-Development Flow change from
Storm Flows Flows, Unmitigated Flows, Mitigated Pre-Development
(AEP) (m3/s) (m3/s) (m3/s) (m3/s)
39% 0.177 0.282 0.182 2.82%
20% 0.275 0.359 0.252 -8.36%
10% 0.325 0.490 0.331 1.85%
5% 0.402 0.578 0.390 -2.99%
2% 0.707 0.712 0.688 -2.69%
1% 0.807 0.812 0.790 -2.11%
As seen in Table 4 and Table 5, the proposed OSD successfully mitigates the post-development
flows either to pre-development conditions or with a negligible increase over pre-development flows.
As seen in the graphed flow-time graphs in Appendix G the timing of peak flows for each post-
development storm event is closely matched to the pre-development case.
6.5 Recommendation
As demonstrated in Table 4 and Table 5 above, there has been an increase in peak flow from the
pre to post development unmitigated stage. To mitigate this increase in flow 14.0m3 of OSD is
proposed downstream of Catchment B1, which is shown to mitigate total peak site discharge to pre-
development levels. A conceptual arrangement of the proposed detention system can be seen on
sketch plan SK02 in Appendix C.
This arrangement may be subject to modification at the detailed design phase. Final levels across
the site may facilitate provision of storage over the bioretention basin or necessitate reconfiguration
of the OSD tank dimensions / outlet arrangement.
6.6 Onsite Detention Lifecycle Costs
A lifecycle cost analysis is not a part of the scope of this report. All stormwater infrastructure
associated with the development shall be maintained and serviced by the owners of the development
at no cost to Council.
BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH Page 14
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix J - Civil Engineering Report and SBSMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.