Extension to Currency Period - Approved MCU21 0182 01 {As Published} · MCU21/0182.01
a. Noosa Native preferred species;
b. 45 litre pot size;
c. a minimum of 1 metre behind the back of the kerb; and
d. NATSPEC certification.
44. The existing mature Poinciana tree located on the front/southern side boundary and
included within Approved Plans must be retained and protected during construction.
45. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures healthy,
sustained and vigorous plant growth. All plant material must be allowed to grow to full
form and be refurbished when its life expectancy is reached.
46. Prior to requesting a prestart meeting:
a. Tree protection fencing must be installed under the supervision of a qualified
person*. (Refer to Advisory Note)
47. A condition report including photographs of the frontage of the site must be completed
and submitted to Council at the prestart meeting.
DURING CONSTRUCTION
Engineering
48. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans/documents and conditions detailed in this Decision Notice;
b. The relevant conditions of the higher order Material Change of
Use/Reconfiguration of Lot approval viz. MCU21/0182 & RAL21/0024 to which this
approval relates;
c. All relevant Noosa Council Planning Scheme Policies, standard drawings,
standard specifications and guidelines; and
d. The latest version of the Healthy Waterways document “Water Sensitive Urban
Design Technical Design Guidelines for South East Queensland” for all water
quality devices to be constructed on site.
Works within Road Reserve/Reinstatement
49. Safe pedestrian access on all streets in the vicinity of the development must be
maintained at all times. Should footpath/road closures be necessary to carry out
construction works, Council’s Engineering Officer must be notified prior to the proposed
closure and all requirements complied with.
50. All frontage works must match neatly with existing road and verge/footpath features.
Additional works beyond the frontage may be required to provide an acceptable
transition to existing road and verge/footpath profiles.
51. Electrical conduits or other services proposed to be installed within existing and
proposed road reserves under existing sealed carriageways, concrete pathways,
concrete/sealed driveways or significant vegetation must be installed by boring.
Trenching is not permitted, unless specifically approved by Council.
Pathways
52. Trench width cuts across footpaths are not permitted. Whole footpath panels must be
replaced in the footpath where services are installed across footpath alignments.
53. All pathway modification must be constructed in accordance with the following
requirements:
Document Set ID: 23016595
Version: 3, Version Date: 14/05/2024 Page 8 of 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Extension to Currency Period - Approved MCU21 0182 01 {As Published}.pdfRelated documentApplication case desk ↗
About this file
- File size
- 212 KB (small file)
- File type
No other editions are linked here.