Original source · versioned page text
ASTP-Resp-To-FA
RESPONSE
Please refer to the Civil Engineering Plans provided in Attachment 1, which provide the required access and
parking outcome, illustrating the surface transition levels within the road reserve to eliminate trip hazards.
ITEMS 5 & 6 - LANEWAY DEDICATION AND WIDENING
The Noosa Plan 2020 supports the use of lanes provided that necessary improvements to the
lane are carried out. Performance Outcome PO17 of the Cooroy Local Plan Code requires the
widening and upgrading of laneways in Cooroy. The requirement is for the dedication of
land, 2 metres wide along the lane frontage and the construction of suitable frontage works.
The submitted documentation does not indicate the necessary dedication and/or works.
Information Required
5. Provide amended plans that indicate the required 2m road dedication along the Olivine
Lane frontage.
6. Provide preliminary plans demonstrating the extent of external frontage works. The
plans must be prepared by a suitably qualified person (RPEQ – Registered Professional
Engineer of Queensland) and include:
a. widening of the existing Olivine Lane formation with seal and kerb & channel to
match the alignment of the new pavement and kerb line west to the site (i.e. along
the adjoining No 29 Tewantin Road – Olivine Lane frontage). The works must be
designed in accordance with Council standards and the specific site requirements.
b. transitions at either end to smoothly match with the existing formation, kerb line
and grades.
c. conveyance of stormwater runoff longitudinally along the lane without adversely
affecting adjoining or opposing properties.
d. any required alterations and upgrades to existing stormwater pits and services,
which may be necessary to match new roadworks.
e. connection of existing and new stormwater drainage systems to the new
roadworks.
RESPONSE
Please refer to the Civil Engineering Plans provided in Attachment 1, which provide the required external
frontage works detail. Further, the revised Building Design Plans in Attachment 2 acknowledge the required land
resumption.
ITEM 7 - SEWER CONNECTION
Council has concerns that due to the slope of the land and the depth of the sewer main, the
proposed dwelling facing Olivine lane may not be able to suitably connect and drain to the
existing sewer main. Any change required to the floor level may impact on the proposal and
upon Council’s assessment of the development.
Information Required
Provide details of the alignment and levels of the existing sewer main on the site, and a
written confirmation from Unitywater that states that the proposed floor level is sufficient
to provide fall to connect to the existing sewer main.
Our ref: 220219 Page 3 of 5