Skip to the record
For the highest quality transcripts.

Original source · versioned page text

ASTP-Resp-To-FA

of 5

Page text shows just the words. Original shows the document exactly as it was published.

RESPONSE
Please refer to the Civil Engineering Plans provided in Attachment 1, which provide the required access and
parking outcome, illustrating the surface transition levels within the road reserve to eliminate trip hazards.



            ITEMS 5 & 6 - LANEWAY DEDICATION AND WIDENING
            The Noosa Plan 2020 supports the use of lanes provided that necessary improvements to the
            lane are carried out. Performance Outcome PO17 of the Cooroy Local Plan Code requires the
            widening and upgrading of laneways in Cooroy. The requirement is for the dedication of
            land, 2 metres wide along the lane frontage and the construction of suitable frontage works.
            The submitted documentation does not indicate the necessary dedication and/or works.

            Information Required
            5. Provide amended plans that indicate the required 2m road dedication along the Olivine
                 Lane frontage.
            6. Provide preliminary plans demonstrating the extent of external frontage works. The
                 plans must be prepared by a suitably qualified person (RPEQ – Registered Professional
                 Engineer of Queensland) and include:
                  a. widening of the existing Olivine Lane formation with seal and kerb & channel to
                      match the alignment of the new pavement and kerb line west to the site (i.e. along
                      the adjoining No 29 Tewantin Road – Olivine Lane frontage). The works must be
                      designed in accordance with Council standards and the specific site requirements.
                  b. transitions at either end to smoothly match with the existing formation, kerb line
                      and grades.
                  c. conveyance of stormwater runoff longitudinally along the lane without adversely
                      affecting adjoining or opposing properties.
                  d. any required alterations and upgrades to existing stormwater pits and services,
                      which may be necessary to match new roadworks.
                  e. connection of existing and new stormwater drainage systems to the new
                      roadworks.

RESPONSE
Please refer to the Civil Engineering Plans provided in Attachment 1, which provide the required external
frontage works detail. Further, the revised Building Design Plans in Attachment 2 acknowledge the required land
resumption.



            ITEM 7 - SEWER CONNECTION
            Council has concerns that due to the slope of the land and the depth of the sewer main, the
            proposed dwelling facing Olivine lane may not be able to suitably connect and drain to the
            existing sewer main. Any change required to the floor level may impact on the proposal and
            upon Council’s assessment of the development.

            Information Required
            Provide details of the alignment and levels of the existing sewer main on the site, and a
            written confirmation from Unitywater that states that the proposed floor level is sufficient
            to provide fall to connect to the existing sewer main.



Our ref: 220219                                                                                            Page 3 of 5
Log in to download the original file

ASTP-Resp-To-FA.pdf · 293 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.