Construction Environmental 06683025-3000(AA)
Management Plan October 2006
Commercial Development

Rev: 000 Page7
Eenie Creek Road, Noosaville

 

 

 

 

 

11.0 DOCUMENTATION AND REPORTING FRAMEWORK

The following documents relate to environmental performance and form part of the EMP:

1. Environmental Management Plan (EMP);

2. Environmental Procedures (Appendices to the EMP);
3. Site Induction Signatory Form;

Inspection and Monitoring Records;

Environmental Audit Reports;

Concerns Register; and

2 an Ww

Rectification Requests and Instructions.

Items 3 to 7 are defined in the following sections.

11.1 Site Induction Signatory Form

All contractors or employees of the Project Manager working at the proposed development
site must undergo a Site Induction for Environmental Management. The inductee shall sign a
form stating their attendance at the site induction. It is the responsibility of the Project
Manager to verify the satisfactory completion of the form.

The Site Induction attendance signatures shall be documented at the end of the site
induction (Form 3).

11.2 Records of Inspection and Monitoring

The outcome of the weekly meeting and site walk through will be recorded on the inspection
form given in the List of Forms. Any monitoring that requires more frequent attention will
be completed as required and recorded on the Inspection & Monitoring Sheet.

The originals of these sheets shall be kept at the site office (Form 2).
113. —_ Environmental Audit Report

The Project Manager will appoint an independent auditor to carry out audits of the
implementation of the EMP.

A copy of the independent environmental audit report shall be provided to the Project
Manager.

Golder Associates

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application part 3 [As Published].pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.