07/2125 - Op Works - Bulk Earthworks [As Published] · 142007.2125
(14)] Dougtas Partners
Page7
concrete could be reused provided they are crushed to suitable particle size and are blended with
soil materials.. Hydrocarbon contaminated soils (as encountered i in Pit 4) should be appropriately
remediated or spoiled (if allowed).
The fill moisture content could be well outside suitable placement moisture, and significant moisture
conditioning will be required, with careful control and observation by experienced geotechnical
personnel. Care should be taken not to over-wet any high plasticity clayey soils which can'lead to
problems associated with trafficability and workability. Clay soils should not be over-compacted (ie.
-not more than 102% Standard) and dry of optimum as this can lead to future swelling and softening
under changes to moisture content or inundation from water.” ."
Where. clay soit’ is reused as engineered filing, it. is ; recommended that the: final platform ‘be
completed with a minimum of 150mm of imported, low plasticity, clayey granular material (minimum
CBR 15%) to reduce the effects of seasonal moisturétehan Je and foundation soil reactivity under
buildings, to reduce the pavement gravel thicknesses and iftiprove pavement life, and to improve
surface trafficability particularly during or after pefio ods, of wet weather.
7.6 Site Preparation and Fill Compaction
The approach to subgrade preparation intareas of deep, uncontrolled fill will depend on tolerable
. settlements. In the area of the building whe heuncontoled filtis shallow, the existing fill should
‘be excavated and recompactes “ont replaced.with seléct gran ilar fill as described later in this section
of the report.
In pavement areas ther fevare areastofi 30 Bppoorly\eo mpacted uncontrolled fill that contain some
deleterious materialshe seitlements ee ype, of fill cannot be reliably predicted, however as a
guide, total settlementsef up to%8% of filltthickness occurring over.a 20 year period could oceur in
relatively clean fill, with pogsible large differégtial, settlements where looser pockets occur in the fill.
The clayey fill appears dry, and larger ler ‘collapse’ type settlements could also occur when the fill
becomes wet, Where: there arek init organic materials present, larger settlements will also be
experienced, . es
There are'several options that could be considered for areas of deep fill as follows;
. Option 1 — Low Risk: Remove and sort the uncontrolled. fill to remove unsuitable materials
(such as timber, metal and deleterious, soft, wet or highly compressible material or topsoil
material rich in organics or root matter), and reinstate the excavation with the ‘clean‘ sorted fill
compacted in layers. Inert building material such as bricks and concrete could be reused by
blending with soil fill provided they break down (or are crushed) to a maximum particle size of
-- 75mm. Total settlements of the fill of the order of 1% of fill thickness could be expected over a
20 year petiod, with very small to negligible differential settlements (except those associated
with fill depth). It is estimated that in the lower fill, up to 25% to 50% of material would be
unsuitable, but depending on practicality, of sorting the material, a large part of the lower
levels of the fill may need to be spoiled. : .
. Option 2 — Very High Risk: Excavate existing uncontrolled fill to 2m below design subgrade
level, proof roll and compact the subgrade, removing and replacing and any soft or wet areas,
then reinstate to design subgrade level with clean select fill compacted in layers. This option
will partially reduce total settlements and assist with reducing differential settlements, although
.. Settlements will still be a similar order of magnitude to those for the existing uncontrolled fill.
Report-on Geotechnical investigation Project 33984
Proposed Bunnings Warehouse, Eumundi-Noosa Road, Noosaville 16 August 2006
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2125 - Op Works - Bulk Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.