07/2125 - Op Works - Bulk Earthworks [As Published] · 142007.2125

of 56

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

pavement Subgrades, except as indit;

“1)) Dougtas Partners

“Page 8

* This option would only typically be suitable where large settlements could be tolerated (e.g.

unsealed hardstand areas).

Option’ 3 — High Risk: Similar to option 2, but after excavation to 2m below design subgrade,
treat the subgrade using Landpac deep impact compaction to remove some of the settlements
from the remaining underlying fill and then reinstate to design subgrade’ using compacted fill.
This technique will remove significant voids from the uriderlyinig fill and thereby reduce the
potential for collapse type settlements. Previous experience using this technique has removed
up to 200mm of future’ settlement from deep uncontrolled fill. Previous experience also
indicates that the lightweight ‘Broons’ square roller (sometimes promoted for this purpose as a
low cost alternative), would not remove sufficient settlements i in this particular case.

Table 4— Estimated Fill Settlements

 

 

Material : Estimated Possible Order of Magnitude of
|@, Long Térm Settlements for 6m of Fill
Option 1-- Remove, sort and recompactél; Up to:60mm
existing fill” A

 

Option 2 — Excavate 2m, reinstate with sorted AL Up to Sooqim or more*
controlled fil : Bn.

 

 

 

' [Option 3 — Excavate Om, treat with iC - Up to 150mm*
Limpactor, reinstate with sorted controlled TiN |

"material ich in organics or ro a Ds,

 

Note: * but higherWwhere highly, déléterious materials exist at depth

  
 
  

  

. Remove any, ‘uncontrolied’gor dele jous, ‘Sot, wet or highly compressible material or topsoil

Where clayey soils areXencountered at formation level, assess moisture contents, which
should be adjusted so they rerifythe range OMC -2% (dry) to OMC +2% (wet), where Omc i is
the optimum: moisture content'at'Standard compaction. :

Test roll the complete surface of the subgrade beneath the proposed embankment pad or
pavement, in order to detect the presence of any ‘soft or loose zones, which should be
excavated out and replaced ‘with approved filling. Test rolling should be carried out with a

. smooth drum roller with a minimum, Static weight of 8- tonne.

Compact the tyned natural foundation soil to a minimum density index of 80% (sands) 0 or
minimum dry density ratio of 97% Standard (clays).

Any controlled filling should be adequately keyed into natural residual slopes (if any) by means
of a benched Interface. .

Approved filling, should be placed in layers not exceeding 200mm loose thickness, with each
layer compacted to: a minimum dry density ratio of 97% Standard. Where filling is clayey,

. moisture content within the filling should be maintained within OMC -2% (dry) to OMC +2%

(wet): during and after compaction. Imported filling should preferably comprise low plasticity
materials: (maximum. plasticity index of 50%) with a maximum particle size of 75mm (after
.break down during compaction).

 

Report on Geotechnical investigation " Project 33984
Proposed Bunnings Warehouse, Eumundi-Noosa. Road, Noosaville 16 August 2006

Used in these records

About this file

File size
3.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2125 - Op Works - Bulk Earthworks [As Published].pdf · 3.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.