07/2125 - Op Works - Bulk Earthworks [As Published] · 142007.2125
(13) Douglas Partners
Page 10
All batter slopes, need to be topsoiled and grassed to reduce the risk of erosion and deterioration.
Lined open drains should be constructed across the top of cut and fill batter slopes to minimise
overland water flow down the batters. .
Where steeper temporary batter slopes are required, measures such as “hit and miss” construction
or soil nail walls may be suitable. Detailed assessment for these measures is outside the scope of
this report. Steeper temporary slopes may also be possible subject to detailed inspection by
experienced geotechnical personnel during construction. Near vertical.excavations are likely to be
suitable for shallow trenches (less than 1.5m depth) such as required for installation of underground
services and foundations. All trenches deeper than 1.5m should be shored or battered for stability
whenever personnel are to enter the trench. : , .
7.8 + Settlement of Controlled Filling
yon “ Re, .
Where bulk filling is placed under controlled ¢Ohditions, there i$, potential for ‘creep’ of the filling
material as the filling settles over time under. self Weight. \ ,
Potential movements for such filling cant estimatehgee percentage ‘of the layer thickness. Such
settlement may be in:the order of 0.5% toal%, of to filhicknoss for clayey filling over a 20 year
gl ular rockymaterials, a lower percentage might.be
period. Where filling predominantly, comprisé
prises*glayey material,a higher percentage
appropriate, and where the filliffg»predominahtly ¢o
might be appropriate.
Under self Weight will vary in accordance with the depth of
Estimates of bulk fillingscreep settle Ne
| meneayhers filling thicknesses are varied, such as over
filling. This may lead“t"différential si
existing sloping grounds ‘
‘The creep settlement estimates. of bk filling under self weight must'be added to the settlement
estimates of upper level footings,.in engineered filling,-and:compared with settlement estimates for
footings founded ‘in rock. The ‘designer must be aware of the potential for large’ differential
settlements where footings in t same structure are founded’ in materials of differing
compressibility, such as engineered bulk filling and natural clays.
7.9 Footings.
Based on the ground conditions encountered in the bores, it is expected that suitable foundations for
the building will comprise a combination of high level strip and pad footings, with slab stiffening to
suit anticipated site movements (where required), and bored -piers ‘to support heavily loaded or
movement-sensitive. parts of the building... . a :
High level strip:and pad footings founded in engineered fill prepared in accordance with this report,
can be designed using the allowable bearing pressures indicated in the following table. Footing
Settlements are estimated to be around 1% to 2% of footing width, in addition to any shrink-swell
and bulk fill settlements (indicated previously in this report). The potential movements are noted,
and the building and slab in particular need to be detailed to accommodate these movements.
Dowelling of the slab is recommended where differential settlements are a significant risk. The
potential for differential movements between.any piled. sections of the building and those supported
‘on fill is noted and will need to be accommodated.for in design. : : .
Report on Geotechnical tnvestigation - Project 33984
Proposed Bunnings Warehouse, Eumundi-Noosa Road, Noosaville 16 August 2006
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2125 - Op Works - Bulk Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.