NOOSA COUNCIL IDAS Development Application Decision Notice                                                  8 of 17


50.    All stormwater drainage shall be collected on site and discharged so there is no net increase in
       stormwater runoff from the site.
51.    Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank (minimum
       storage 3000 litres per dwelling/unit ) that is installed to ensure water from the tank can be used for
       external uses (such as watering gardens, irrigation, ornamental ponds, water features, topping-up
       swimming pools, outdoor cleaning, etc) and for use in flushing of toilets internal to the dwelling/building.
       All rainwater tanks are to be designed and installed in accordance with the Queensland Development
       Code (QDC), Part 25 – Rainwater Tanks, and shall be part of the plumbing application in conjunction with
       the building approval. The location and capacity of the tanks shall be clearly shown on the plans
       submitted for Building Works approval.
52.    To ensure that polluted run-off does not enter Council’s stormwater drainage system, stormwater run-off
       from the carparking areas and the driveways shall have the first flush (the first 12 mm of rainfall or hose-
       down) collected in a grease/oil arrestor provided on site prior to being permitted to discharge into
       Council’s drainage system.
       All other clean stormwater, such as roof water, can be collected on site and discharged through a single
       underground drain line directly into the existing drainage system, bypassing the grease/oil arrestor.
       To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil arrestors, which
       shall be submitted to the Council for approval prior to obtaining a Development Permit for Operational
       Works.
       The approved maintenance plan shall be incorporated in the Community Management Scheme for the
       development and a copy of this shall be provided for Council’s records prior to commencement of the
       approved Use.
       A Development Permit for Building Works shall not be granted until a Development Permit for Operational
       Works has been issued in regard to the drainage scheme.
53.    All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
54.    The site shall be connected to the Noosa Sanctuary Development sewer reticulation system and be
       constructed in accordance with Council’s standards and requirements at no cost to Council.
55.    All sewage shall drainage by means of gravity to the sewage pump station located on lot 2 SP110327 as
       per the Deed made on 22 December 1999 between Noosa Council, Aqua Blue (Noosa) Pty Ltd and the
       applicant, Johanna Jacoba Thannhauser.
56.    Should the drainage via gravity not be possible a new arrangement will need to be negotiated with Noosa
       Council
57.    The sewer system is to be kept and maintained in a condition suitable for use and shall not cause adverse
       impacts on the environment.
Town Water Supply
58.    Connection to Council’s water supply shall be generally in accordance with Plan H-SP-02 drawn by Brian
       Burnett & Associates dated 2007.02.12 for Aqua Blue Noosa Sanctuary Development.
59.    The site shall be connected to Council’s town water supply and be constructed in accordance with
       Council’s standards and requirements at no cost to Council.
60.    Each individual water connection to the water reticulation system shall extend to the property boundary
       and be metered. All fees for the supply of water meters shall be paid to the Council.
61.    All water meters must be located in an easily assessable location to facilitate unhindered reading by
       Council and/or Council’s contracted water meter readers, and not behind fences or locked gates.
62.    For Multiple Uses (including Building Format Plans, Group Title Plans, etc) the development shall be
       served by:
       62.1. A single Body Corporate water meter to measure the total water consumption (including fire hose
             reels, but excluding fire hydrants and fire sprinkler systems), and
       62.2. Individual water meters to each tenement capable of being separately rated, and
       62.3. A fire service (fully testable single detector check with metered bypass), where applicable, for flows
             to fire hydrants and fire sprinkler systems (excluding fire hose reels).




MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@ec126c42\@[email protected]

Used in these records

About this file

File size
137 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2006.00001395.001 [As Published].pdf · 137 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.