NOOSA COUNCIL IDAS Development Application Decision Notice                                                  9 of 17


Acid Sulfate Soils
                                                                                             3
63.    As the site is located below the 5m AHD, any excavation works consisting of 100m or greater will need to
       be carried out in accordance with State Planning Policy 2/02 Planning and Managing Development
       Involving Acid Sulfate Soils. In this regard appropriate testing and supporting documentation prepared by
       a suitably qualified specialist shall be submitted to Council for approval prior to obtaining a Development
       Permit for Operational Works.
                                                                                         3
64.    As the site is located below the 5m AHD, any filling works consisting of 500m or greater and with an
       average depth of 0.5m or greater will need to be carried out in accordance with State Planning Policy 2/02
       Planning and Managing Development Involving Acid Sulfate Soils. In this regard appropriate testing and
       supporting documentation prepared by a suitably qualified specialist shall be submitted to Council for
       approval prior to obtaining a Development Permit for Operational Works.
Erosion and Sediment Control
65.    Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
       control measures such as silt fencing, controlled gravel access to the site and controlled disposal of
       waste, will be necessary.
       In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted
       to the Council for approval prior to obtaining a Development Permit for Operational Works.
Contributions Towards Council Infrastructure
66.    Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or upgrading
       various infrastructure at the rates applicable at the time of payment. An estimate only of the contribution
       amounts under the current Council policies and requirements is outlined in the table below:

          Contribution Required For:                                                             Amount:

          PSP12 – Public Open Space Contributions (Park)                                         $26,768
          PSP16 – Sewerage Headworks Contributions                                               $25,204
          PSP17 – Water Supply Headworks Contributions                                           $36,670
          PSP20 – Pathway Trunk Network Contributions                                            $6,685

          TOTAL Contribution Amount =                                                            $95,327
          Please note, that these amounts are all subject to variations in the Consumer Price Index, All Groups Brisbane
          from June 2007 until the date of payment.
       All contributions must be paid prior to the issue of a Development Permit for Operational Works
General
67.    Any damage caused to any public utility during the course of construction shall be repaired to Council’s
       standards and at no cost to Council.
68.    Any alteration of any public utility or other facilities necessitated by the development of the land or
       associated construction works external to the site shall be at no cost to Council.
69.    The transportation of all materials to and from the site shall be undertaken in a manner such that no
       particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
       be covered to prevent materials including dust being windblown from the vehicle.
Environmental Health
70.    The developer must provide waste storage and disposal facilities in accordance with Planning Scheme
       Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, including an
       external imperviously paved area correctly sized for all refuse and recycling containers and suitably
       screened from public places and neighbouring properties. A bin wash area is required with a cold-water
       tap, hose and drain outlet connected to sewer, via a bucket trap. The drain outlet is to be designed to
       prevent storm water entry to the sewerage system and this can be achieved with a nib wall 50mm high
       and up to 700mm x 700mm wide (max 0.5m²), or alternatively the waste area can be roofed, or any other
       design approved by Council.
71.    A Waste Management Plan (Operational) in accordance with Planning Scheme Policy No. 9 “Waste
       Management Multi-Dwellings and Commercial and Industrial Premises”, must be submitted for the day-to-
       day operation of the development and approved by Council’s Health Section prior to issue of development
       permit for operational works.




MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@ec126c42\@[email protected]

Used in these records

About this file

File size
137 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2006.00001395.001 [As Published].pdf · 137 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.