07/0806 - Preliminary Building Work assessable against the planning scheme [As Published] · 172007.806
INTEGRATED PLANNING ACT 1007,
Contaminated land wo
Involving material change of use
and? of reconfiguring a tot may tigger this.
teferral, .
For mote information refer to Guide. -
Unloss you enisiored “nara of the above" fo °
17, the: application requires sssecement’by the
Envirrimenial Protaation Agincy (EPA), Hon.
agency othar then EPA.ts the astenement
menager tor the application, EPA will be 8
application in:
Electricity:infrastructure -
+ For mony information’ refer to scheidite Zot the IP"
Uniss you answered nono ofthe above! to
ef
IDAS Assassment Checklist, Version 20, 2 April 2007
17. The application involves: (tiex tne appteabie boxtes)
(1()) reconfiguring a fot for which all of part of the premises are =
(a) premises mentioned in the IPA, schedule 8, part 1, table 2 -
« item 5, including the exemption otherwise provided for by paragraph (d);
« item 6, including he exemption otherwise provided for by paragraph (@); or
» item 7, including the exemption athenwise provided for a mining activity or petroleum
activity; or
(b) in.an ares for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1
CI (ii), a material change.of use -
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if atl or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
__ Ri) none of the above .
18, The application involves: tick the appfcable box/es)
(0) _ reconfiguring a lot where eny part of the lot is -
« gubject to an easement in favour of a distribution entity or transmission entity under the ©
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or
» situated within 100m of a substation sito;
(Ui) a matorlal change of use, assessable against a planning scheme and not associated
with reconfiguring a tot if - . . .
« any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
_ grid or supply network under that Act; and
« any structure of work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement; . .
C(t) a material change of use, assessable against a planning schame and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation ,
site; : :
C0 (wv) operational work that is filing or excavation assessable against the planning scheme,
not associated with reconfiguring a tot, if -
» any part of the premises is subject to an easement in favour of @ distribution entity or
transmission entity under the Electricity Act 1994 and the wark is located wholly or panty in
the easement,
« the work is located wholly or partly within 10m of a substation site;
[24 (v)_none of the above.
. Does the application involve development assessable against the planning scheme and on land
designated for community infrastructure?
{i} intended to be supplied by a public sector entity; and
(i) on land not owned by or on behaff of the Stale; and
(ii) other than development - 9
(a) for the designated purpose; or
“ (b) carried out by, or on behalf of, the designator.
{NO
(Yes
Pega é
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0806 - Preliminary Building Work assessable against the planning scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.