Council archive · source document
G Engineering Report And Plans · 132007.2398
Attached to the e-mail 132007.2398.02 Request to change existing approval (2 of 3) Engineering report & plans, Stormwater Plan.
Plans and drawings: the text below has words only, no drawings.
Very large file (10.6 MB): may take a few minutes to open.
CALIBRE CONSULTING
14.145 Strategic Transport Network
Specific Outcomes Probable Solutions Proposed Measures
(if code assessable)
Collector and local streets are designed to discourage
through traffic;
AND
S2.5
A collector street is provided parallel to arterials
particularly where they pass through town centres;
AND
S2.6
Appropriate width of road and verge is provided to allow
streets to perform their designated functions in the street
network;
AND
S2.7
A network of local streets focused towards an activity
centre or school is provided for safe and efficient
pedestrian and bike access to the school, safe conditions
for school buses, setdown facilities, with on-site parking
where practical;
AND
S2.8
Passive surveillance is maximised by designing streets to
enable development to front all streets and roads,
including arterials;
AND
S2.9
B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS CIVIL ENGINEERING REPORT | 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
G ENGINEERING REPORT AND PLANS.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.