GENERAL COMMITTEE MEETING AGENDA 11 JANUARY 2016
17. Water quality monitoring results must be analysed by a suitably experienced water
quality specialist and identify whether or not nutrient increases within the receiving
waterways were associated with the release of nutrients from the Greenhouse during
a flood event. The analysis must be provided to Noosa Council officers within 30
business days following inundation of the site Greenhouse with flood waters.
18. Where the results of the Operational Phase Water Quality Monitoring demonstrates
there are nutrient increases associated with the release of nutrients from the use during
a flood event, the operator must identify and rectify the cause of the release, and
include appropriate mitigation works to prevent future releases in flood events as far
as practicable. The operator then must demonstrate to Council that appropriate
measures have been incorporated into operations, to prevent a release of nutrients to
the receiving waters in future flood events.
Earthworks and Retaining Walls
19. All earthworks must be undertaken in accordance with an Operational Works approval,
and contained entirely within the site, unless written permission from the respective
landowner(s) is provided to Council.
20. Bund 1 & 2 indicated on the Site Layout Plan drawn by Water Technology and dated
01/07/2015 must be removed and the existing levels reinstated within 2 weeks of this
approval date.
21. Bund 3 as indicated on Site Layout Plan drawn by Water Technology and dated
01/07/2015 must be relocated a minimum of 5m away from the root zones of the
existing vegetation adjacent the creek. The new bund and area between it and the
waterway shall be revegetated with suitable species and densities in accordance with
Planning Scheme Policy 3 – Landscaping Plants & Guidelines. The earthworks and
landscaping must be undertaken in accordance with an Operational Works approval
and be lodged within 1 month of the Material Change of Use approval date.
Damage to Services and Assets
22. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
Development Permit for Reconfiguring a Lot (Access Easement)
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with
prior to the use commencing, and then compliance maintained at all times while the
use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply with
the approved plans of development. The approved plans are listed in the following table
unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
D-01569-06-B Site Plan drawn by Martoo Consulting 23/06/2015
Page 49 of 50
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.