As shown in Table 3, the peak flow rate of stormwater runoff and the total runoff volume off site has
reduced as a result of the stormwater management system. The proposed infiltration/detention tank is
therefore considered to be adequate. Results for the 1% AEP, 10min duration event are outlined in
Figure 5 and 6 below.


         Peak Flow measured at rear = 48L/s




          Total runoff volume (Node A inflow)
          = 24.58m3




               Figure 5 - XP Storm Results; Pre-Developed Model (1% AEP, 10min Duration)


         Peak Flow measured at rear = 46L/s




          Total runoff volume
          (Node A inflow + Node B outflow) = 16.75m 3



               Figure 6 - XP Storm Results; Post-Developed Model (1% AEP, 10min Duration)



4 April 2019                           Stormwater Management Report                                9
S18-030                                   22 Arakoon Crescent,

Used in these records

About this file

File size
4.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Stormwater Management Report.pdf · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.