Council archive · source document
Stormwater Management Report · MCU19/0008
Figure 3 - Ensemble Statistics Utility Results; 10% AEP Event
Figure 4 - Ensemble Statistics Utility Results; 1% AEP Event
Table 3 below compares the peak flow rates and total runoff volume for the pre-developed and post-
developed model.
Table 3 - XP Storm Results
Median Peak Flow Rate Off Site (m3/s) Total Volume Off Site (m3)
Duration Storm
EY/AEP (min) Pattern Pre-developed Post-developed Pre-developed Post-developed
10 9 22 10 (-12) 11.37 3.55(-7.83)
0.5EY 25 6 21 18 (-3) 19.05 11.16 (-7.89)
60 9 18 18 28.03 19.98 (-8.05)
10 3 34 27 (-7) 16.93 9.16 (-7.77)
10%AEP 25 3 29 21 (-8) 28.28 20.32 (-7.96)
60 2 26 21 (-5) 43.55 35.56 (-7.99)
10 4 48 46 (-2) 24.58 16.75 (-7.83)
1%AEP 25 10 41 40 (-1) 41.23 33.40 (-7.83)
60 7 34 34 66.77 58.85 (-7.91)
4 April 2019 Stormwater Management Report 8
S18-030 22 Arakoon Crescent,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.