RFI - Stormwater Management Plan
The original of this document is very large (13.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 5, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnThe standing water table forms a profile similar to the shape of the dune,
albeit at a depressed scale and emerges as seepage flows adjacent Noosa inlet
at or about RL 5.0m.
The zone between RL 5.0m and the inlet was recognised as having
particularly high ecological values, supporting numerous stands of swamp
mahogany and various species of fauna. Critically it was recognised that
these ecological values were dependant on maintenance of the natural
hydrogeological regime and no nett reduction in rainwater infiltration post-
development.
Section 3.1 of the EMP is reproduced below:-
Strategy: To ensure no net reduction of rainwater infiltrating the sand dunes
beneath the site. To ensure adequate treatment of runoff from landscaped and
hardstand areas prior to infiltration.
Responsibility: Consulting Engineer and Landscape Architect.
Management Actions: All design within the Residential High Density areas to comply
with the following guidelines:
1. All runoff from storms up to 10 year average recurrence interval (ARI) to
be infiltrated into the sand subgrade without runoff.
2. Infiltration to be achieved via swales and ephemeral streams and rapid
infiltration pits (RIP’s)
3. All infiltration devices to be located within the “residential high density
building envelope” as shown on Ken Hicks and Associates drawing 1128
Master.
4. Surcharge runoff from storms greater than the capacity of infiltration
devices to be directed toward ecological restoration areas and roadways as
dispersed sheet flow rather than concentrated flows.
5. Stormwater runoff from landscaped and hardstand areas to be pretreated
prior to infiltration.
6. Runoff from roadways and landscaped areas to be directed to landscaped
swales or ephemeral streams for biological treatment including vegetative
plantings in accordance with the Landscape Master Plan.
7. Areas of swales and ephemeral streams shall be lined with a soil layer to
retard infiltration and allow biological treatment of runoff. Soils will be
remediated by mixing with loams to achieve a hydraulic conductivity of
100mm/hr.
8. Swales and ephemeral streams to be planted in accordance with approved
Landscape Master Plan in order to promote biological treatment of runoff.
Consequently, and in order to counteract the effect of significant impervious
areas being constructed, the design approach will see stormwater runoff from
the proposed development’s roofs and hardstand areas, for events up to 100-
year ARI infiltrated into the natural sands via a series of Rapid Infiltration Pits
__________________________________________________________________________
A6769/22/SWMP/RevB – June
2023 Page 3 of 9
SH/PL
Brah101 Pty Ltd t/as ALTA PROJECTS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.