Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management Plan · OPW11/0023

of 24

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
nj
     2         Environmental Planning

     2.1       Environmental Issues
     The following environmental issues are potentially relevant to this project:

                 Air Quality           Water Quality              Waste       Noise             Land
                 •     Dust        •      Groundwater       Construction        Noise
               •      Exhaust           Contamination       Waste and       and             Soil Erosion
                     Fumes                Discharges to     Litter            Vibration
                                         Stormwater


     Our aim is to minimise, and where possible, eliminate these risks by preventing environmental


r    incidents from occurring that could lead to injury or damage to human health or property, or
     breaches of the law. In addition, we want to reduce any potential negative environmental effects
     of our operations at The Noosa Bunnings Project, even where their impacts are less obvious.

     For example, we want to ensure that our on-site activities do not contaminate local stormwater
     drains and groundwater. We want to reduce noise and dust emissions from the site which may
     affect the amenity of residents and businesses in the area. We also wish to make sure that we re-
     use or recycle as much construction waste as possible from the Noosa Project.

     We will achieve this through careful planning, which involves the following:

           •     Adherence to correct work practices, ie: cutting of concrete with vacuum and / or water
                 suppression systems.
           •     Use of machinery with environmental controls
           •     Setting environmental objectives and targets
           •     Training and information at site induction for all staff and sub-contractors

     Effective environmental management is often a matter of common sense. Minimising
     environmental risks is often done by adhering to the existing site safety requirements of keeping
     the site clean, tidy, organized and include the dust / noise issues of the project in the induction
     procedure / toolbox meetings. Many issues can be managed by quite straightforward procedures -
     for example, dust can be effectively controlled by light watering of exposed areas during windy
     periods

     Each environmental issue has a particular risk associated with it, which is found by calculating the

t    probability of a particular impact occurring (Contaminated ground, Asbestos etc) and the
     consequence of such an impact if it does occur. The process by which this has been done for this
     site is detailed in Section 2.2.

     Section 2.3 shows each environmental issue pertinent to this site, the potential environmental
     impact, overall level of risk, and procedures for on-site management (control measures are listed
     in detail in Section 3.1).
1    2.2       Risk Assessment Process
     Risk assessments have been performed on likely environmental impacts to determine the
     probability of a particular impact occurring, the consequence of such an impact if it does occur, the
     overall level of risk, and the response required to address the impact.

     Using the definition table below, the most likely environmental consequences from an incident are
     calculated - "if the incident occurs, what is the likely consequence?"

     H. Troon Pty. Ltd., Creswick Road, Ballarat.   Ph: (03) 5339 2208

Used in these records

About this file

File size
4.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management Plan.pdf · 4.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.