Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management Plan · OPW11/0023
Plans and drawings: the text below has words only, no drawings.
nj
2 Environmental Planning
2.1 Environmental Issues
The following environmental issues are potentially relevant to this project:
Air Quality Water Quality Waste Noise Land
• Dust • Groundwater Construction Noise
• Exhaust Contamination Waste and and Soil Erosion
Fumes Discharges to Litter Vibration
Stormwater
Our aim is to minimise, and where possible, eliminate these risks by preventing environmental
r incidents from occurring that could lead to injury or damage to human health or property, or
breaches of the law. In addition, we want to reduce any potential negative environmental effects
of our operations at The Noosa Bunnings Project, even where their impacts are less obvious.
For example, we want to ensure that our on-site activities do not contaminate local stormwater
drains and groundwater. We want to reduce noise and dust emissions from the site which may
affect the amenity of residents and businesses in the area. We also wish to make sure that we re-
use or recycle as much construction waste as possible from the Noosa Project.
We will achieve this through careful planning, which involves the following:
• Adherence to correct work practices, ie: cutting of concrete with vacuum and / or water
suppression systems.
• Use of machinery with environmental controls
• Setting environmental objectives and targets
• Training and information at site induction for all staff and sub-contractors
Effective environmental management is often a matter of common sense. Minimising
environmental risks is often done by adhering to the existing site safety requirements of keeping
the site clean, tidy, organized and include the dust / noise issues of the project in the induction
procedure / toolbox meetings. Many issues can be managed by quite straightforward procedures -
for example, dust can be effectively controlled by light watering of exposed areas during windy
periods
Each environmental issue has a particular risk associated with it, which is found by calculating the
t probability of a particular impact occurring (Contaminated ground, Asbestos etc) and the
consequence of such an impact if it does occur. The process by which this has been done for this
site is detailed in Section 2.2.
Section 2.3 shows each environmental issue pertinent to this site, the potential environmental
impact, overall level of risk, and procedures for on-site management (control measures are listed
in detail in Section 3.1).
1 2.2 Risk Assessment Process
Risk assessments have been performed on likely environmental impacts to determine the
probability of a particular impact occurring, the consequence of such an impact if it does occur, the
overall level of risk, and the response required to address the impact.
Using the definition table below, the most likely environmental consequences from an incident are
calculated - "if the incident occurs, what is the likely consequence?"
H. Troon Pty. Ltd., Creswick Road, Ballarat. Ph: (03) 5339 2208
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management PlanRelated documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.