          a)    Establish the source of the incident and prevent any further discharge by shutting down equipment or stopping
                any leaks;

          h) Clean up any spills, leaks. etc. using appropriate equipment e.g. spill response kit if required;

          c) Immediately report the incident to the Site Manager, following the procedures outlined below;

          d)    Check for faults in equipment, or evidence of incorrect operation;

          e)    Service or replace equipment if required;



I         f)


          g)
                Document the incident using the Environmental Incident Report form and report it to the Operations Manager;
                and

                Implement lessons learned from the incident to prevent future occurrences.


    Following this initial response, the Site Manager is responsible for ensuring that follow-up and preventative actions
    appropriate to the nature and scale of the incident are carried out. These follow-up and preventative actions are to be
    documented using the Corrective & Preventative Action Report form.


    All employees must also be familiar with the Site Safety Plan, which describes site first aid and evacuation
    procedures and lists contact details for emergency response and environmental authorities.


    3.4        Monitoring & Reporting

    Regular environmental monitoring, recording, and reporting is to be carried out by the Site Manager using the Weekly
    Environmental Report form, which is to be sent to the Operations Manager.

    In the event of a significant environmental incident occurring, the Environmental Incident Report form must also be
    used.




t   4      Supporting Documents




     Erosion and Sediment Control: Construction Sites and Waterway Health
                          in south-east Queensland

    H. Troon Pty. Ltd., Creswick Road, Ballarat.   Ph: (03) 5339 2208




I

Used in these records

About this file

File size
4.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management Plan.pdf · 4.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.