Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management Plan · OPW11/0023
Plans and drawings: the text below has words only, no drawings.
The South East Queensland Healthy Waterways
4.1.1 The regulatory framework
Strategy 2007-2012 identified land development as a
I
major contributor of sediment and other pollutants to
The key regulator of a site will be determined on a case-
Queensland's waterways.
by-case basis but generally speaking, state government
and local government controlled sites will be regulated by
Sediment is a contaminant that can seriously degrade
DERM using s440ZG of the Environmental Protection
water quality and starve marine life of oxygen, leading to
Act 1994 (CEP Act). Under the EP Act, it is an offence to
fish kills and damage to aquatic ecosystems.
unlawfully deposit 'prescribed water contaminants' in
There are many potential causes of water contamination; waters, roadside gutters and stormwater drainage. It is
however, in some catchments the highest recorded also unlawful to deposit a contaminant where it might
concentrations of pollutants in stormwater are of flow into such places.
sediment from land development sites.
Prescribed water contaminants (a full list of which can be
Rapid urban and infrastructure development in south- found in Schedule 9 of the Environmental Protection
east Queensland is predicted to cause a 60 per cent Regulation 2008) include:
increase in sediment loads to waterways within the next
20 years if a business-as-usual approach is maintained.
clay, gravel, sediment (including from building activities).
stones and similar organic and inorganic matter
More than 85 per cent of sediment that leaves an urban
development site does so during the construction phase.
earth, which the EP Act defines as sand, soil, silt or mud.
Improving the management of stormwater during the
construction phase of development and infrastructure Private development sites will be regulated by local
projects will: government through a development permit issued under
the Sustainable Planning Act 2009 (SPA) as well as
s440ZG of the EP Act.
• conserve topsoil - a valuable asset
Therefore, incidents involving water contamination within
• protect downstream waterways from the harmful a local government's jurisdiction will be deemed a breach
impacts of turbid stormwater of the development consent (under SPA) as well as a
breach of s440ZG of the EP Act.
• Reduce the likelihood of impacts to construction
t
timeframes and costs from wet weather or The general environmental duty (GED) as defined in
enforcement action. s319 (1) of the EP Act also applies. It states that a
person must not carry out any activity that causes, or is
Everyone involved in construction and development likely to cause, environmental harm unless the person
needs to take responsibility for erosion and sediment takes all reasonable and practicable measures to prevent
or minimise the harm.
I
control,
The Annual Compliance Plan 2010-2011 is publicly available online at
4.1 Erosion and sediment control compliance <www.erm. qld. gov.au>.
The Erosion and Sediment Control Compliance Project Refer to s493A under the EP Act for the definition of unlawful acts 2
(ESCCP) is part of the Department of Environment and
Resource Management's (DERM) Annual Compliance
Plan (ACP) 2010-2011 .
The aim of the ESCCP is to protect environmental values
of waters and water quality objectives in south-east
Queensland waterways by focussing on erosion and
sediment control during the construction phase of urban
land developments and infrastructure projects.
Department of Environment and Resource Management
(DERM) regional service delivery officers, in partnership
with local government officers, will be conducting
inspections of selected sites. This approach is designed
to ensure there is consistency across both levels of
I
government who share responsibility for regulating these
activities.
H. Troon Pty. Ltd., Creswick Road, Ballarat. Ph: (03) 5339 2208
1
0
I
I
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management PlanRelated documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.