     The South East Queensland Healthy Waterways
                                                                      4.1.1    The regulatory framework
     Strategy 2007-2012 identified land development as a



I
     major contributor of sediment and other pollutants to
                                                                      The key regulator of a site will be determined on a case-
     Queensland's waterways.
                                                                      by-case basis but generally speaking, state government
                                                                      and local government controlled sites will be regulated by
     Sediment is a contaminant that can seriously degrade
                                                                      DERM using s440ZG of the Environmental Protection
     water quality and starve marine life of oxygen, leading to
                                                                      Act 1994 (CEP Act). Under the EP Act, it is an offence to
     fish kills and damage to aquatic ecosystems.
                                                                      unlawfully deposit 'prescribed water contaminants' in
     There are many potential causes of water contamination;          waters, roadside gutters and stormwater drainage. It is
     however, in some catchments the highest recorded                 also unlawful to deposit a contaminant where it might
     concentrations of pollutants in stormwater are of                flow into such places.
     sediment from land development sites.
                                                                      Prescribed water contaminants (a full list of which can be
     Rapid urban and infrastructure development in south-             found in Schedule 9 of the Environmental Protection
     east Queensland is predicted to cause a 60 per cent              Regulation 2008) include:
     increase in sediment loads to waterways within the next
     20 years if a business-as-usual approach is maintained.
                                                                      clay, gravel, sediment (including from building activities).
                                                                      stones and similar organic and inorganic matter
     More than 85 per cent of sediment that leaves an urban
     development site does so during the construction phase.
                                                                      earth, which the EP Act defines as sand, soil, silt or mud.
     Improving the management of stormwater during the
     construction phase of development and infrastructure             Private development sites will be regulated by local
     projects will:                                                   government through a development permit issued under
                                                                      the Sustainable Planning Act 2009 (SPA) as well as
                                                                      s440ZG of the EP Act.
           •    conserve topsoil - a valuable asset
                                                                      Therefore, incidents involving water contamination within
           •    protect downstream waterways from the harmful         a local government's jurisdiction will be deemed a breach
                impacts of turbid stormwater                          of the development consent (under SPA) as well as a
                                                                      breach of s440ZG of the EP Act.
           •    Reduce the likelihood of impacts to construction




t
                timeframes and costs from wet weather or              The general environmental duty (GED) as defined in
                enforcement action.                                   s319 (1) of the EP Act also applies. It states that a
                                                                      person must not carry out any activity that causes, or is
     Everyone involved in construction and development                likely to cause, environmental harm unless the person
     needs to take responsibility for erosion and sediment            takes all reasonable and practicable measures to prevent
                                                                      or minimise the harm.


I
     control,
                                                                       The Annual Compliance Plan 2010-2011 is publicly available online at
     4.1       Erosion and sediment control compliance                <www.erm. qld. gov.au>.


     The Erosion and Sediment Control Compliance Project               Refer to s493A under the EP Act for the definition of unlawful acts 2
     (ESCCP) is part of the Department of Environment and
     Resource Management's (DERM) Annual Compliance
     Plan (ACP) 2010-2011 .

     The aim of the ESCCP is to protect environmental values
     of waters and water quality objectives in south-east
     Queensland waterways by focussing on erosion and
     sediment control during the construction phase of urban
     land developments and infrastructure projects.

     Department of Environment and Resource Management
     (DERM) regional service delivery officers, in partnership
     with local government officers, will be conducting
     inspections of selected sites. This approach is designed
     to ensure there is consistency across both levels of



I
     government who share responsibility for regulating these
     activities.




    H. Troon Pty. Ltd., Creswick Road, Ballarat.      Ph: (03) 5339 2208

1
0



I
I

Used in these records

About this file

File size
4.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Additional information enclosing Plans, Bioretention and Gross Pollutant Trap Maintenance & Monitoring Plan, Environmental Management Plan.pdf · 4.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.