Beach Road Retreats Stage 2 Conditions
Attached to the e-mail 132008.1779.01 - Request to Extend Relevant Period (Stage 2).
132008.1779.1 33. Should any clearing be required for the construction of the internal driveways the trees to be removed shall be clearly marked on site and a joint inspection undertaken with a Council Officer prior to the commencement of any clearing works. 34. All vehicles shall enter and leave the site in a forward direction. Car Parking 35. Carparking shall be provided within the site generally as shown on drawing number C1384-01-A dated 19 November 2010 by Wolter Consulting Group except as modified herein. 36. A minimum of 20 covered carpark spaces shall be provided on site, including 1 clearly defined disabled carpark space. 37. The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004 for user class 1A with allowance for vehicles to enter and leave the site in a forward gear and with a minimum head clearance (headroom) at any point of 2.2m. 38. Turning areas shall be provided within the internal driveways or adjacent to the “retreat” buildings to enable vehicles to-exit the “retreat” buildings in a forward gear. The extent of the turning area shall be clearly shown on any plans submitted for Operational Works approval. 39. All carparking shall be kept, maintained and line-marked in a condition fit for use. Stormwater Management 40. The applicant shall use permeable surfaces for low turnover parking areas, low use access ways and shall investigate the possibility of reducing impermeable surfaces throughout the Stage in accordance with OO11b). 41. Detailed drawings shall be submitted with the Operational Works Application demonstrating that the access ways, driveways and parking surfaces are designed to maintain existing drainage patterns and avoid concentrating stormwater flows. Erosion and Sediment Control 42. Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary. In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted to the Council prior to obtaining a Development Permit for Operational Works. Management Plans 43. The applicant shall submit reports for the relevant stage in accordance with the Environmental Management Strategy as outlined in Section 6 of the NNSETP Code, unless previously approved by Council for all stages. These reports shall be submitted for approval in conjunction with Operational Works application for the relevant stage. 44. A Construction Management Plan addressing all construction phases of the relevant stage shall be prepared by a suitably qualified person and submitted to Council for approval prior to obtaining a Development Permit for Operational Works. The plan should aim to address every foreseeable problem eg: movements of excavation and construction machinery, building material deliveries, stockpiling of materials etc that is likely to occur during the construction process of the relevant stage and include recommendations on how these can be overcome or minimised. PD-DA-FM58/5-02/04/2009 Page 6 of 19
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Beach Road Retreats Stage 2 Conditions.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.