Beach Road Retreats Stage 2 Conditions
Attached to the e-mail 132008.1779.01 - Request to Extend Relevant Period (Stage 2).
132008.1779.1 General 45. 46. 47. 48. 49. For the following classes of work associated with development, a Development Permit for Operational Works must be obtained prior to commencement of works relating to that class of work. The application may combine any or all of these classes of work:~ 45.1. Access and/or Carparking. 45.2. Site Civil Works. 45.3. Roadworks. 45.4. Stormwater Drainage. 45.5. Landscaping. 45.6. Erosion & Sediment Control Digital detailed designs including drawings, calculations, etc shall be submitted with any application for a Development Permit for Operational Works in respect of roadworks and stormwater drainage works. The design shall be in accordance with Council’s Planning Scheme Policy PSP05 — Engineering Design Standards — Roads, Drainage and Earthworks. To avoid conflict with underground pipes or services, all existing and proposed services required by the development shall be shown on the plans. Any damage caused to any public utility during the course of construction shall be repaired to Council's standards and at no cost to Council. Any alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site shall be at no cost to Council. 3 The transportation of all materials to and from the site shall be undertaken in a manner such that no particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall be covered to prevent materials including dust being windblown from the vehicle. Hydrology 50. Prior to the issue of a Material Change of Use for Stage 3A substage (ii) of the western development, the following must occur: 50.1. A MUSIC model must be submitted for a stormwater treatment design that demonstrates that the development can achieve compliance with the Noosa Northshore Eco-Tourism Portal Development Code - Environmental Management Plan — Element 4 Stormwater, Erosion and Sediment Control - Objectives 1 and 2. Stormwater must be outlet to a legal point of discharge. 50.2. Compliance with Conditions 44, 45, 45.1, 45.4, 45.10, and 46 of 23537DA must be demonstrated. 50.3. The development must comply with all requirements of 23537DA. 50.4. The development must comply with all requirements of the Noosa Northshore Eco-Tourism Portal Development Code. Environmental Health 51. Potable drinking water to all sinks, taps and showers is to meet the National Health & Medical Research Council Australian Drinking Water Guidelines. Prior to the commencement of use, certification shall be provided to Council prepared by a suitably qualified RPEQ Engineer, to certify that the development is provided with a safe, continuous and adequate supply of potable water in accordance with this condition. PD-DA-FM58/5-02/04/2009 Page 7 of 19
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Beach Road Retreats Stage 2 Conditions.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.