Beach Road Retreats Stage 2 Conditions

Attached to the e-mail 132008.1779.01 - Request to Extend Relevant Period (Stage 2).

of 19

Page text read automatically using OCR, there may be inaccuracies

132008.1779.1

 

General

45.

46.

47.

48.

49.

For the following classes of work associated with development, a Development Permit
for Operational Works must be obtained prior to commencement of works relating to
that class of work. The application may combine any or all of these classes of work:~

45.1. Access and/or Carparking.
45.2. Site Civil Works.

45.3. Roadworks.

45.4. Stormwater Drainage.

45.5. Landscaping.

45.6. Erosion & Sediment Control

Digital detailed designs including drawings, calculations, etc shall be submitted with
any application for a Development Permit for Operational Works in respect of
roadworks and stormwater drainage works. The design shall be in accordance with
Council’s Planning Scheme Policy PSP05 — Engineering Design Standards — Roads,
Drainage and Earthworks. To avoid conflict with underground pipes or services, all
existing and proposed services required by the development shall be shown on the
plans.

Any damage caused to any public utility during the course of construction shall be
repaired to Council's standards and at no cost to Council.

Any alteration of any public utility or other facilities necessitated by the development of
the land or associated construction works external to the site shall be at no cost to
Council. 3

The transportation of all materials to and from the site shall be undertaken in a manner
such that no particle matter escapes onto a public road. All vehicles carrying materials
either to or from the site shall be covered to prevent materials including dust being
windblown from the vehicle.

Hydrology

50.

Prior to the issue of a Material Change of Use for Stage 3A substage (ii) of the western
development, the following must occur:

50.1. A MUSIC model must be submitted for a stormwater treatment design that
demonstrates that the development can achieve compliance with the Noosa
Northshore Eco-Tourism Portal Development Code - Environmental
Management Plan — Element 4 Stormwater, Erosion and Sediment Control -
Objectives 1 and 2. Stormwater must be outlet to a legal point of discharge.

50.2. Compliance with Conditions 44, 45, 45.1, 45.4, 45.10, and 46 of 23537DA must
be demonstrated.

50.3. The development must comply with all requirements of 23537DA.

50.4. The development must comply with all requirements of the Noosa Northshore
Eco-Tourism Portal Development Code.

Environmental Health

51.

Potable drinking water to all sinks, taps and showers is to meet the National Health &
Medical Research Council Australian Drinking Water Guidelines. Prior to the
commencement of use, certification shall be provided to Council prepared by a suitably
qualified RPEQ Engineer, to certify that the development is provided with a safe,
continuous and adequate supply of potable water in accordance with this condition.

PD-DA-FM58/5-02/04/2009 Page 7 of 19

Log in to download the original (Beach Road Retreats Stage 2 Conditions.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.