Original PDF page 11, section 1. The text section number identifies this passage in the reader.
d) All works to control the vine and all other woody weeds must be completed by 1 June
2026.
All works and weed management methodologies must be undertaken in accordance
the referenced weed management plan to ensure that the spread of frangipani vine is
managed and the infestation into vegetation to be retained is minimised.
(Arboriculture) Retention of Existing Trees
44. All works must be carried out in accordance with the referenced Arborist Report Dated
28.05.2025 version 10 listed within this Decision Notice, with the exception of the
following:
a. Survey the location of Fraser Island Creeper Tecomanthe hillii to the southwest of
the development footprint and provide management techniques required to
preserve and maintain during the construction phase and into perpetuity.
b. Any trees identified to be retained trees that have declined since the last
arboricultural survey and are no longer suitable to be retained must be removed
and the area subject to rehabilitation planting.
The report must be resubmitted to Council incorporating the above amendments prior
to the issue of any Development Permit for Operational Works.*
*(Refer to Advisory Note)
Construction Management Plan
45. All works must be carried out in accordance with the referenced Arborist Report Dated
28.05.2025 version 10 listed within this Decision Notice, with the exception of the
following:
a. Updated to include the revised development layout and include all construction
management amendments required by the layout change.
b. Cars will be restricted to an allocated carpark at the northern side of the site
adjacent to the existing resort.
c. A raised deck walkway will provide access to the Eco-Cabins whilst allowing
ground flora to grow beneath providing shelter and habitat for fauna. The walkways
will also act as a corridor for the cabin services with pipes and conduit hung
beneath the walkways reducing the need for trenching (and potential root
interference etc) across the site. Post holes must be excavated using exploratory
vacuum excavation under arborist supervision.
d. All workers on the site are to be made aware of the Tree Protection Guidelines
and Procedures and any site-specific safety measures by the main contractor prior
to commencing works.
e. Project arborist to oversee all works proposed as part of the construction
management plan
The report must be resubmitted to Council incorporating the above amendments prior
to the issue of any Development Permit for Operational Works.*
*(Refer to Advisory Note)
46. The trees identified for retention in the Arborist report dated 28.05.2025 version 10 listed
within this Decision Notice must be maintained in good health for the life of the tree.
8274014_1
3459-9154-4892, v. 1
8309250_1
9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.