Original source · versioned page text
Sealed Judgement
Very large file (118 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 9, section 1. The text section number identifies this passage in the reader.
Earthworks and Retaining Walls
33. All earthworks and associated batters/retaining structures must be undertaken in
accordance with an Operational Works approval and contained entirely within the
subject site unless written permission from the respective landowner(s) is provided to
Council.
34. All earthworks and associated batters/retaining structures must be contained entirely
within the Tourist Accommodation Zone part of the subject site.
35. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining
walls that are publicly accessible and exceed 1.0m in height must be fitted with a
commercial grade safety fence.
Damage to Services and Assets
36. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
WASTE DISPOSAL
37. Prior to the issue of any Operational Works approvals for this development an
Operational Waste Management Plan must be submitted to Council. The Waste
Management Plan must be in accordance with the Waste management Code and
Planning Scheme Policy 9 - Waste Management.
38. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy 9 - Waste Management. The facilities must include an
impervious area, within the site, correctly sized for all refuse and recycling containers
and suitably screened from public places and neighbouring properties. A bin wash area
is required with a cold-water tap, hose and drain outlet connected to sewer, via a bucket
trap. The drain outlet must be designed to prevent storm water entry to the sewerage
system.
39. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
40. Storage, disposal and management of solid, liquid and vegetative waste is conducted in
a safe and ecologically sustainable manner without environmental nuisance. In this
regard, vegetated waste must be disposed of via a green waste bin or at a local transfer
station.
LANDSCAPING
41. The development site must be landscaped. The works must be undertaken in
accordance with an Operational Works approval and the Noosa Plan for that specific
area and must include in particular:
8274014_1
3459-9154-4892, v. 1
8309250_1
7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.