Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Annual BMP Review Report 2018-2019_May 2019

Attached to the e-mail URGENT - RAL18/0023 - Essential Bushfire Management Review - Noosa Civic.

Attached to the e-mail FW_ URGENT_ Essential Bushfire Management - Noosa Civic.eml, inside FW Bushfire Management - Noosa Civic.msg.

Attached to the e-mail FW URGENT Essential Bushfire Management - Noosa Civic.msg.

of 19

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Report on Annual Review of Bushfire Preparedness                                                 Q.I.C.
for Noosa Civic (2018-2019)


1. Introduction
The large area of land south of Eenie Creek Road know as Noosa Civic has been
developed as a multi use commercial hub.


The area south and east of the development has remained in part vegetated. A bushfire
review undertaken in 2018 recommended some additional actions while the adjoining
vegetation was retained. (see Aerial Photograph No. 1)


2. Description of Proposed Actions
The summary of proposed works is detailed below as Table 1.


TABLE 1
             Summary of Proposed Works with Timing and Budget Estimate
                                           Immediate Attention
    Items                     Items Description      Timeframe/Frequency     Cost Estimate
    4.1.1                     Clear access track     2018/19                 $12,000
                              from Hofmann Drive
                              to Walter Hay Drive
                              Connection ( 4
                              metres wide –
                              formed and drained)
    4.1.2                     Upgrade of dead        2018/19                 $8,000
                              end track running
                              north from track in
                              4.1.1 to a loop as
                              shown in Aerial
                              Photo. 3 (4x4
                              standard – not
                              formed and drained)
    4.1.4                     Widening of existing   2018/19                 $30,000 +
                              path from the south                            (Quotes are required
                              west corner of the                             for better estimate)
                              Big W building
                              around to the south
                              east corner to
                              provide vehicular
                              access from
                              Hofmann Drive to
                              north east car park




  18-028 Annual Review Report 2018-2019                               Commercial-in-Confidence
                                                                                       Page 1
Log in to download the original file

Annual BMP Review Report 2018-2019_May 2019.pdf · 4.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.