Original source · versioned page text
Annual BMP Review Report 2018-2019_May 2019
Attached to the e-mail URGENT - RAL18/0023 - Essential Bushfire Management Review - Noosa Civic.
Attached to the e-mail FW_ URGENT_ Essential Bushfire Management - Noosa Civic.eml, inside FW Bushfire Management - Noosa Civic.msg.
Attached to the e-mail FW URGENT Essential Bushfire Management - Noosa Civic.msg.
Report on Annual Review of Bushfire Preparedness Q.I.C.
for Noosa Civic (2018-2019)
4.2.1 Removal of 2018/19 $15,000+
understorey
vegetation and dead
end dangerous
trees on the
southern side of
Hofmann Drive to
Walter Hay Drive
access track as
mentioned in 4.1.1
(total width of 10m
including the track)
4.2.2 Removal of 2019/20 $5,000
understorey
vegetation around
Fuel Reduction Unit
1 and 2 ( achieved
in conjunction with
4.1.1 and 4.1.2)
4.3 Provide hose and Prior to the 2019 fire $5,000
reels adjacent to season.
three Urban Fire
Hydrants along the
southern wall of Big
W
Sub Total $75,000 +
Subsequent Attention
4.1.3 Construction of Only required if Investigation: $1,500
access track from hazard reduction Construction: $8000 -
end of Hofmann burning proves $10,000
Drive around impossible by 2020.
southern section of
the property out to
Walter Hay Drive
4.2.4 Unit 1 Arrange Fuel As soon as $5,000
Reduction Burn with preparation work is
Local Rural Fire completed.
Brigade Late Winter 2019
4.2.4 Unit 2 Arrange Fuel 2021/22 $5,000
Reduction Burn with
Local Rural Fire
Brigade
18-028 Annual Review Report 2018-2019 Commercial-in-Confidence
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.