Skip to the record
Accept no imitations.

Original source · versioned page text

Annual BMP Review Report 2018-2019_May 2019

Attached to the e-mail URGENT - RAL18/0023 - Essential Bushfire Management Review - Noosa Civic.

Attached to the e-mail FW_ URGENT_ Essential Bushfire Management - Noosa Civic.eml, inside FW Bushfire Management - Noosa Civic.msg.

Attached to the e-mail FW URGENT Essential Bushfire Management - Noosa Civic.msg.

of 19

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Report on Annual Review of Bushfire Preparedness                                                       Q.I.C.
for Noosa Civic (2018-2019)



    4.3                         Confirm urban water     Prior to the 2019 fire   TBC
                                supply along the        season.
                                south-east access
                                driveway out of the
                                carpark to facilitate
                                connection of urban
                                water if need be
    Area 2                      Arrange fuel            2020/21                  TBC
    (see Plan                   reduction burn with
    032310.10)                  National Park

    Sub Total                                                                    $19,500 – $21,500 +



                                          Ongoing Annual Obligations
    4.2.3                       Removal of all          Annually                 $4,000
                                understorey
                                vegetation out of the
                                edge of the bank as
                                is the current
                                practice
    Annual Review               Site inspection prior   Annually                 $2,000
                                to September.           See attached
                                                        checklist.
    Sub Total                                                                    $6,000

These actions included the possibility of future fuel reduction burning. The high rainfall
and lack of suitable weather confirms the difficulty associated with these activities but they
should be pursued each year as an aim.


3. Actions Completed as at May 2019
The site was inspected on 22nd May 2019 and the overall situation is vastly improved on
the 2018 position.

The site is much safer with improved access and a much better capacity for suppression if
it is required.

The details of actions and outcomes include:-
   1. (4.1.1) – Access track from Hoffmann Drive to Walter Hay Drive has been cleared
          to a 4 metre width. (see Photograph Nos. 1 & 2 and Access Management Plan)




  18-028 Annual Review Report 2018-2019                                     Commercial-in-Confidence
                                                                                             Page 3
Log in to download the original file

Annual BMP Review Report 2018-2019_May 2019.pdf · 4.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.