PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 28 APRIL 2015
Site Access and Driveways
23. A sealed access driveway must be provided from Factory and Hill Streets to all parking
and maneuvering areas of the development. The works must be undertaken in
accordance with an Operational Works approval and must include driveway
crossovers generally in accordance with IPWEAQ standard drawing SEQ R-051 Type
B.
24. Approval from the Department of Transport and Main Roads for the final design of the
site access, driveway and frontage works must be submitted in writing to Council prior
to the issue of any Development Permit for Operational Works.
Car Parking
25. A minimum of 8 car parking spaces must be provided and marked on the site and
made available and accessible at all times while the use is open for business. The
works must be undertaken in accordance with an Operational Works approval and
must include in particular:
a. A minimum of 1 disabled parking space located in front of tenancy 2; and
b. Crossfalls, gradients and dimensions in accordance with Australian Standard
AS2890:2014 Parking Facilities.
26. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and maneuvering and kept in a tidy and safe condition at all times.
27. Directional signage must be provided to direct visitors and customers to the car
parking spaces provided on site.
Service Vehicles
28. Service vehicle parking, maneuvering and standing spaces must be provided on the
site. The works must be undertaken in accordance with an Operational Works
approval.
Pedestrian and Bicycle Facilities
29. Bicycle facilities must be provided for the development, including 2 bicycle parking
spaces on the site and be indicated on the Operational Works landscaping plan.
30. A 2m wide concrete footpath shall be provided within the road verge for the entire
length of the site’s frontages to Factory Street and Hill Street. The works must be
undertaken in accordance with an Operational Works approval.
This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009 being
non-trunk infrastructure.
Stormwater Drainage/ Flooding
31. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval and must include the works described in the “Technical Note”
prepared by TOD Consulting Engineers dated 7 November 2014 and the “Stormwater
Management Plan” Revision A prepared by Aquaintel Pty Ltd dated 20 August 2014.
32. The development of the site must not impede the overland flow of stormwater/flood
water through the site or cause additional ponding of stormwater/flood water on any
adjoining property or road.
Preparation of a Construction Management Plan
33. A preliminary Construction Management Plan must be submitted with the Operational
Works application and must address the following:
Page 42 of 211
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.