Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2015-04-28 Planning and Organisation Committee Agenda

of 211

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (22.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 28 APRIL 2015


      Site Access and Driveways
23.   A sealed access driveway must be provided from Factory and Hill Streets to all parking
      and maneuvering areas of the development. The works must be undertaken in
      accordance with an Operational Works approval and must include driveway
      crossovers generally in accordance with IPWEAQ standard drawing SEQ R-051 Type
      B.
24.   Approval from the Department of Transport and Main Roads for the final design of the
      site access, driveway and frontage works must be submitted in writing to Council prior
      to the issue of any Development Permit for Operational Works.
      Car Parking
25.   A minimum of 8 car parking spaces must be provided and marked on the site and
      made available and accessible at all times while the use is open for business. The
      works must be undertaken in accordance with an Operational Works approval and
      must include in particular:
      a.   A minimum of 1 disabled parking space located in front of tenancy 2; and
      b.   Crossfalls, gradients and dimensions in accordance with Australian Standard
           AS2890:2014 Parking Facilities.
26.   All car parking areas and access driveways must be maintained exclusively for vehicle
      parking and maneuvering and kept in a tidy and safe condition at all times.
27.   Directional signage must be provided to direct visitors and customers to the car
      parking spaces provided on site.
      Service Vehicles
28.   Service vehicle parking, maneuvering and standing spaces must be provided on the
      site. The works must be undertaken in accordance with an Operational Works
      approval.
      Pedestrian and Bicycle Facilities
29.   Bicycle facilities must be provided for the development, including 2 bicycle parking
      spaces on the site and be indicated on the Operational Works landscaping plan.
30.   A 2m wide concrete footpath shall be provided within the road verge for the entire
      length of the site’s frontages to Factory Street and Hill Street. The works must be
      undertaken in accordance with an Operational Works approval.
      This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009 being
      non-trunk infrastructure.
      Stormwater Drainage/ Flooding
31.   The site must be provided with a stormwater drainage system connecting to a lawful
      point of discharge. The works must be undertaken in accordance with an Operational
      Works approval and must include the works described in the “Technical Note”
      prepared by TOD Consulting Engineers dated 7 November 2014 and the “Stormwater
      Management Plan” Revision A prepared by Aquaintel Pty Ltd dated 20 August 2014.
32.   The development of the site must not impede the overland flow of stormwater/flood
      water through the site or cause additional ponding of stormwater/flood water on any
      adjoining property or road.
      Preparation of a Construction Management Plan
33.   A preliminary Construction Management Plan must be submitted with the Operational
      Works application and must address the following:



                                                                                 Page 42 of 211
Log in to download the original file

2015-04-28 Planning and Organisation Committee Agenda(PDF, 21MB).pdf · 22.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.