Original source · versioned page text
2015-04-28 Planning and Organisation Committee Agenda
The original of this document is very large (22.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 28 APRIL 2015
This part of the theatre contains the ‘green room’, including the backstage area (see Figure
1).
Figure 1 – Site Photo of the Majestic Theatre’s southern façade looking from Factory Street
to the northeast. The approximate location of the proposed fire rated wall has been
superimposed.
The applicant indicates no specific industrial tenants have been identified for the proposed
tenancies. However, owing to their relatively small size (100m2), it is likely they will be used
for predominantly small scale service type industries.
The Pomona Arts Society own and manage the Majestic Theatre and made a detailed
submission to the development application. The submission expresses concern about the
proposed industrial development being built too close to the existing silent movie theatre,
which will have adverse noise, light and air flow impacts.
Noise impacts
The Pomona Arts Society’s submission indicates that any new uses adjacent to their site
should be sensitive to the existing silent movie theatre.
In assessing potential noise impacts, it must be recognised that the existing service station
use currently generates noise and the site is adjacent to a main road. The existing service
station approval currently allows for noise at the boundary to be background levels + 8
decibels.
Council’s Environmental Health Officer advises that the construction of the new industrial
units and associated fire walls between the service station and the theatre will actually assist
in reducing noise from the existing service station, as it will provide a physical barrier
between the existing buildings. Notwithstanding this, the proposed development should
contain noise as far as practical. This can be achieved by using suitable construction
methods and acoustic insulation.
Page 47 of 211
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.