Original source · versioned page text
2014-04-28 General Committee Meeting Agenda Pages 65-200
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 28 APRIL 2014 RECOMMENDATION That Council approve Application No. MCU13/0052 for a Development Permit for Material Change of Use for Service & Utility Type 3 Tower situated at 153 Lake Flat Rd, Boreen Point in accordance with the following Conditions of Approval: When Conditions must be Complied With 1. Unless otherwise stated, all conditions of the Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans 2. Development authorised by this approval must be undertaken generally in accordance with the Approved Plans listed within the Decision Notice. Minimum Floor Heights 3. The minimum floor levels of the associated telecommunication cabinets must be constructed above the 1% AEP flood level. Building Height 4. The maximum height of the structure must not exceed 31 metres above the finished ground level and the natural ground surface. 5. Certification must be submitted to Council from a Licensed Surveyor which certifies that the monopole structure does not exceed the maximum height requirement of this Decision Notice. 6. No lights are permitted to be attached to the telecommunications facility, except where required for aircraft hazard lighting purposes or similar. Health and Safety 7. The development must not, at any time during the life of the development, result in human exposure to environmental electromagnetic emissions exceeding the current regulations, standards and/or recommendations of the Australian Radiation Protection and Nuclear Safety Agency (ARPANSA). The carrier of the infrastructure must provide, at any time upon request by Council, written certification to demonstrate compliance with this condition. The written certification must assume: a. a maximum number of users over the lifetime of any pole or other supporting structure b. full power usage c. a maximum down tilt of antennae. 8. Warning information signs and security fencing must be provided on the site to prevent unauthorised entry. Fencing must be set back a minimum of 2 metres from the front boundary and must be camouflaged through the use of colours, materials and screening vegetation to blend the fence into the visual landscape. Such fencing must not include any use of barbed wire or similar materials. Colours and Finishes 9. The monopole and associated panels must be finished in colours that blend in visually into the landscape. Cessation of Use 10. The telecommunications facility must be removed from the site upon cessation of the use. Existing Vegetation 11. A vegetated buffer with a minimum width of 20m shall be maintained around the facility (allowing the existing vegetation to grow to full form), excluding the 5m wide firebreak and 4wd access indicated on the approved plans. Page 66 of 200
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.