Original source · versioned page text
Attachment 1 - Development Approval TPC1957
J.H. Hooton Pty. Ltd. ~. TPC 1957 - 19th November, 1987 - Page 2 5. The open space and setback areas are to be Landscaped in accordance with the Noosa Design Manual and a properly prepared Landscaping plan to be . submitted to and approved by the Shire Planner, prior to the issue of a Building. Approval. Such landscaping is to be completed in . accordance with the approved landscaping plan, prior to the premises ‘being occupied and maintained at all times thereafter to the reasonable satisfaction of the Shire Planner. 6. Existing trees are to be retained, except where required to be removed - due to building operations or the conduct of the approved use. 7 Construction work is permitted only during the hours of 7.00 a.m. to 6.00 p.m. Monday to Saturday, except where extended hours are approved by the Building Surveyor. : Any advertising sign or device is to comply with the provisions of the Noosa Design Manual. The developer is to submit an overall Concept plan for signage prior to the issue of a ‘pufiding: permit. 9, Payment of contributions in accordance with Council's Policy on.Water Supply and Sewerage Headworks, current at the time of Building Approval. Calculations based upon the current Policy including Price Index variation as at October, 1987 are estimated as follows:- Water Supply - $125, 491 Sewerage ~ $ 51,444 TOTAL: $176, 935 The headworks figures are for the units only with additional headworks to be paid in respect of the shops. If payment is not proposed to be made prior to the issue of Building Approval, a cash bond or trading bank guarantee for the required amount is to be lodged prior to the release of that Approval. The contribution is then required to be made within fourteen (14) days of the issue of Building Approval. 10. The developer shall bear the cost of alteration of any public utility or facilities necessitated by the development of the lénd or associated construction works external to the site. | 11. Floor levels for all buildings and other structures, car park areas and fill levels for the site are to be in accordance with the requirements of the Shire Engineer. Such levels shall be provided on application to the Council's Engineering Department. Any filling or other development works undertaken on the site shall be carried out so as not to cause the ponding of water on any adjoining lands and the blockage or interference with any natural watercourses. No earthworks or filling works are to be undertaken until issue of a Building Approval.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.