ORDINARY MEETING MINUTES 15 NOVEMBER 2018
rising flood levels and the associated hydraulic differential to raise and
lower the barrier. The barrier must not require a power supply or human
intervention. The barrier must be maintained by the property owner in
accordance with the manufacturer’s specifications. The works must be
undertaken in accordance with an Operational Works approval and must
include in particular:
a. Certification from a Registered Professional Engineer of Queensland
(RPEQ) that states that the design of the barrier is suitable for its
intended use.
44. The development must include an internal stairwell connecting the
basement level to the upper floor. The stairwell must be located and
constructed to provide an escape route for people to evacuate the
basement in the event the barrier and/or pump system fails. Plans
submitted as part of any subsequent operational works and building permit
must clearly indicate the stairwell.
External Works
45. Mary Street must be upgraded for the length of its frontage to the subject
site. The works must be generally in accordance with drawing number
17699-SK100 Revision A prepared by TOD Engineers and Project
Managers dated 17 August 2018. The works must be undertaken in
accordance with an Operational Works approval and must include in
particular:
a. construction of new kerb and channelling offset 7.5m (3.5m lane and
4m of cycle lane/parallel parking) from the northern side of the
existing landscaped median;
b. suitable transitions from the new kerb line to join with the existing
kerb at the western and eastern end;
c. landscaping of the verge area;
d. construction of a pedestrian footpath in accordance with the
conditions of this Decision Notice;
e. removal of the existing property accesses and reinstatement of the
kerb, footpath and verge area to match the balance of the site
frontage, including the provision of topsoil and turf where the existing
verge is grassed.
Condition 45 is imposed pursuant to s145 of the Planning Act 2016 being non-
trunk infrastructure.
Site Access and Driveways
46. A sealed access driveway must be provided from Mary Street to all parking
and manoeuvring areas of the development. The works must be
undertaken in accordance with an Operational Works approval and must
include in particular:
a. driveway crossovers generally in accordance with Council’s Standard
Drawing Number RS-051 and any associated addendum.
b. suitable safety measures, including warning signage, to improve
driver awareness of the flood barrier, service vehicles and
pedestrians and to enhance driver and pedestrian safety. Warning
signage must be provided near the exit ramp from the underground
parking area and the guest/service area to warn motorists of
pedestrian movement along the frontage street.
Page 27 of 43
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.