ORDINARY MEETING MINUTES 15 NOVEMBER 2018
Car Parking
47. A minimum of 17 car parking spaces, inclusive of 1 courtesy bus space,
must be provided and marked on the site and made available and
accessible at all times while the use is open for business. The works must
be undertaken in accordance with an Operational Works approval and must
include in particular:
a. 13 customer parking spaces (including 4 scooter spaces) within the
total, which are clearly marked for that purpose and accessible at all
times for visitor use.
b. 3 staff parking spaces within the total, which are clearly marked for
that purpose.
c. 1 courtesy bus space within the total.
d. 2 disabled parking space/s within the total.
e. dimensions, crossfalls and gradients in accordance with Australian
Standard AS2890: Parking Facilities.
f. Provision of 20 bicycle parking spaces.
48. All car parking areas and access driveways must be maintained exclusively
for vehicle parking and manoeuvring and kept in a tidy and safe condition
at all times.
49. Directional signage must be provided to direct visitors and customers to the
car parking spaces provided on site.
Service Vehicles
50. Service vehicle parking, manoeuvring and standing spaces must be
provided on the site. The works must be undertaken in accordance with an
Operational Works approval.
Pedestrian and Bicycle Facilities
51. Pedestrian and bicycle facilities must be provided for the development. The
works must be undertaken in accordance with an Operational Works
approval and must include in particular:
a. a 2 metre wide footpath within the road verge for the entire length of
the site’s frontage to Mary Street.
Condition 51 is imposed pursuant to s128 of the Planning Act 2016 being
necessary trunk infrastructure identified by Council’s LGIP to service the
development.
Stormwater Drainage
52. The site must be provided with a stormwater drainage system connecting
to a lawful point of discharge. The works must be undertaken in
accordance with an Operational Works approval and must include in
particular:
a. the works shown on drawing number 17699-SK101 Revision A
prepared by TOD Engineers and Project Managers dated 17 August
2018, with the inclusion of the following:
i. The storage tank must have sufficient capacity to cater for the
runoff from the driveway in a 1%AEP rain event as a minimum.
ii. A back up power system for the pump that is independent of
the mains network.
Page 28 of 43
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.