Acid Sulfate Soils
53. All works must be carried out in accordance with an Acid Sulfate Soil and
Groundwater Management Plan for the development prepared by a
qualified person* and referenced in a Development Permit for Operational
Works. The Acid Sulfate Soil and Groundwater Management Plan must
specifically address how lowering of the groundwater level as a result of
the works will be avoided.
*(Refer to Advisory Note)
54. All waters, including stormwater runoff, groundwater seepage and leachate
from acid sulfate soils must achieve the following quality prior to release
from the site:
a. a pH range of 6.5-8.5 pH units
b. 50mg/L maximum total suspended solids concentration
c. 0.3mg/L maximum total iron concentration
d. 0.2mg/L maximum total aluminium concentration
e. no visible plume at either the point of release from the site or within
a waterway
55. The basement must be designed and constructed as a water excluding
structure in accordance with Australian Standard AS3735 "Concrete
Structures for Retaining Liquids" to ensure groundwater does not enter the
basement after construction is completed.
56. All treated material must undergo verification testing at the rate of one
sample per 250m3 throughout the duration of the excavation phase of
the development. The verification testing must be undertaken by a
qualified person* using the SPOCAS or Chromium Reducible Sulphur
testing suite, and the results must be submitted to Council for appraisal.
Electricity and Telecommunication Services
57. Unless otherwise stipulated by telecommunications legislation at the time
of construction, the development must be provided with all necessary
conduits, pits and pipes to accommodate the future connection of optic fibre
technology telecommunications.
58. Certification must be submitted to Council from all relevant service
providers which certifies that the development has met the requirements of
this Decision Notice and all applicable legislation at the time of
construction.
Earthworks and Retaining Walls
59. All earthworks must be undertaken in accordance with an Operational
Works approval, and contained entirely within the subject site unless
written permission from the respective landowner(s) is provided to Council.
60. All retaining walls must be designed and constructed in accordance with
the planning scheme and must be certified by an RPEQ where exceeding
1.0m in height. All retaining walls that are publicly accessible and exceed
1.0m in height must be fitted with a commercial grade safety fence.
Preparation of a Preliminary Construction Management Plan
61. A preliminary Construction Management Plan must be submitted with the
Operational Works application and must address the following:
Page 29 of 43
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.