Council archive · source document
2013-05-09 Negotiated Decision Notice Request (MCU12-0133) · MCU12/0133
Attached to the e-mail Representations for Negotiated Decision Notice.
CRAVEN OVENDEN TOWN PLANNING PAGE 2
and pedestrian path, to minimise disturbance to this landscaping strip. Multiple
connection points should be avoided. …
Condition 17 & 18(d) – Access Driveway Surface Treatment
These conditions require the proposed access driveway to have a sealed surface treatment. However, to
accord with the strategy of the approved Stormwater Management Plan, which is to preserve the natural
hydrology of the site by minimising ground-level impervious surface, the applicant would like to construct the
access driveway using a permeable pavement surface. The driveway would need to be constructed to an
appropriate Council-endorsed standard in terms of vehicles per day or Equivalent Standard Axles, which can
be determined and conditioned at the Operational Works stage - we expect it would be designed to the
standard of Easement Road as Planning Scheme Policy 5 Engineering Design Standards – Roads, Drainage
And Earthworks.
Therefore we request wording of these two conditions generally in accordance with the following:
17. A sealed or permeable surface access driveway must be provided from Girraween Court to
all parking and manoeuvring areas of the development….
18. The works must be undertaken in accordance with an Operational Works approval and
must include in particular:
…
(d) a sealed or permeable surface driveway for the full length of the access to the
proposed internal boundary, including underground service conduits for the necessary
services.
Condition 20 – Service Vehicles
This condition requires the carpark to be designed and constructed to allow service vehicle access through the
carpark to the refuse enclosure to collect rubbish bins. This assumes the development requires industrial
sized bins and onsite collection, but this is not the case: the approved development does not require and will
not utilise industrial sized bins. Instead, domestic sized wheelie bins will be used and taken to the kerb for on
street collection. Therefore, service vehicle access to the refuse enclosure is not required. Nevertheless, the
access driveway connecting to the adjoining eastern lot will be designed and constructed to allow service
vehicle access to that adjoining lot.
As such, we request this condition to be amended generally as follows:
20. Service vehicle manoeuvring and access must be provided on the site for servicing the
adjoining lot to the east. The works must be undertaken in accordance with an
Operational Works approval and in particular must include area sufficient to allow a refuse
vehicle future access the adjoining lot to the east.
Condition 22 – Lawful Point of Discharge and Flood Detention
Condition 22 requires the site be provided with a formal stormwater drainage system connected to a lawful
point of discharge. While this is a relatively standard condition, the approved development intends a highly
efficient stormwater management system that manages all of its stormwater generation on site, without
generating any off site runoff. The development minimises the creation of ground level impervious surfaces
and utilises the naturally very high permeability of the site’s sandy soils, resulting in:
A net reduction in peak flow rates compared with the site’s current pre-developed state.
A net reduction in runoff volumes compared with the site’s current pre-developed state.
A net reduction in pollutants compared with the site’s current pre-developed state.
Because the development reduces natural stormwater runoff instead of increasing it, a lawful point of
discharge is achieved by allowing, in major storm events, excess runoff to drain to the kerb and channel
system via sheet flow, without need for a piped stormwater connection to Council’s drainage infrastructure.
Please refer to the attached memo for details.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2013-05-09 Negotiated Decision Notice Request (MCU12-0133).pdfRelated documentApplication case desk ↗
About this file
- File size
- 314 KB (small file)
- File type
No other editions are linked here.