Furthermore, the analyses provided in the attached memo demonstrate that the sizing of flood detention in
the Stormwater Management Plan dated 8 August 2012 by Bligh Tanner Pty was conservative (it was derived
using the simplified method from QUDM2007 which is no longer supported in QUDM2013. The memo also
explains why the rational method lacks accuracy on highly pervious soils). It is now clear that the overall
strategy avoids any increase in peak flows, and so the condition in relation to flood detention is not
necessary.
Therefore, we request that this condition be amended as follows:
22. The site must be provided with a stormwater drainage system generally in accordance with
the Site Based Stormwater Management Plan dated 8 August 2012 by Bligh Tanner Pty
Ltd. The works must be undertaken in accordance with an Operational Works approval
and the Noosa Plan’s Water Sensitive Urban Design Code requirements.
Please consider our representations and if you require further information or clarification please do not
hesitate to contact our office on (07) 3217 5771.
Yours faithfully
Michael Edrich
CRAVEN OVENDEN TOWN PLANNING
Encl.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2013-05-09 Negotiated Decision Notice Request (MCU12-0133).pdfRelated documentApplication case desk ↗
About this file
- File size
- 314 KB (small file)
- File type
No other editions are linked here.