2013-05-09 Negotiated Decision Notice Request (MCU12-0133) · MCU12/0133

Attached to the e-mail Representations for Negotiated Decision Notice.

of 8

Text shows just the words. Original shows the document exactly as it was published.

MEMORANDUM




To:      Fulton Trotter                                                     Level 9, 269 Wickham St
                                                                            PO Box 612 Fortitude Valley
ATT:     Mark Kalinowski                                                    QLD 4006, Australia
                                                                            T +61 7 3251 8555
CC:      Michael Edrich – Craven Ovenden                                    F +61 7 3251 8599

         Leon Rowlands – Sunshine Coast Council                             [email protected]
                                                                            www.blightanner.com.au
Date:    8st May 2013                                                       ABN 32 061 537 666

From:    Alan Hoban
Pages: 5 in total.

RE:            Noosa Flexi Learning Centre – Stormwater Runoff


SUMMARY
This memo provides further information to support the Site Based Stormwater Management Plan
for the Noosa Flexi Learning Centre (Bligh Tanner 8th August 2012). It further describes how the
site minimises ground-level impervious areas and seeks to mimic the pre-development hydrology
of the site. This memo has been prepared for the purposes of:
     1. Demonstrating that the site does not need a formalised stormwater connection to the
        street.
     2. Demonstrating that the site has no effective impervious area for the purposes of
        calculating Infrastructure Charges, based on Council’s definition.


APPLICATION STATUS
Please note that there is a current negotiated decision notice lodged in relation to this
development application.

DESCRIPTION OF STRATEGY
In order to avoid affecting the vegetation communities of the Girraween Nature Reserve through
increased wetness, the site seeks to avoid the generation of stormwater runoff by avoiding, to the
extent practicable, any ground level impervious areas. This is consistent with the low-impact
design intent of the site, and also plays a key role in reducing upfront and ongoing costs to the
school, and to Council, associated with the provision of stormwater infrastructure.

The occurrences and magnitude of surface runoff events from the site are reduced as a result of
the proposed strategy due to the detention and reuse of runoff.

In the rare occurrences when surface runoff is generated, it will discharge across the front
boundary of the site via overland flow to the existing kerb and channel, as it currently does,
without causing any nuisance conditions.

The site currently has high infiltration rates
Percolation testing on the site was carried out in September 2012 by Soil Surveys . The field test
method employed in this investigation, ie. Constant Head Test, was carried out in accordance
with AS1547-2000, Appendix 4.1F. At the test location, a 100mm diameter borehole was drilled to
a depth of 500mm. The test hole was then filled to a depth of 250mm, the well permeameter was
put in place and the test commenced. When the fall became constant, ie. 10% or less change
between successive readings, or flow eased, the test was completed. Readings were taken at 30

Used in these records

About this file

File size
314 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2013-05-09 Negotiated Decision Notice Request (MCU12-0133).pdf · 314 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.