Council archive · source document
7 avocet pde · OPW19/0077
Attached to the e-mail Operational Works Application OPW 19/0077 - DA Form 1 - Plans - 7 Avocet Pde, Peregian Beach.
Very large file (16.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
14. Where retaining walls, fences, buildings or other barriers cause a damming effect or result in a concentrated flow of stormwater, an adequate drainage system must be installed. 15. | Excavation work for drains adjacent to buildings must be within the area shown in Fig 3.1.2.1 of the NCC. 16. Roof water is to be conveyed to the kerb and channel or the existing drainage system in accordance with AS/NZ3500.3-2015. 17. Surface water must be diverted away from Class 1 buildings. The external finished surface surrounding the slab must be drained to move surface water away from the building and graded at a minimum slope of 50mm over the first metre from the building. 18. Drainage must be carried out in a way that protects land, buildings and structures in the neighbourhood of the building or land. 19. The minimum soil cover to be provided to Class 6 UPVC stormwater drains is 100mm. This may be reduced to 50mm under paved or concrete areas. In areas subject to light vehicular traffic the minimum required cover is 75mm under reinforced concrete or 100mm under paving. 20. Atermite management system must be installed to deter termites from gaining entry to the building via a concealed route. The termite management system must be selected appropriate to BCA Qld Table 3.1.3.1 and comply with AS3660.1-2010, or have passed the test results required by Section 5 of AS3660.3-2010. A durable notice must be permanently fixed to the building in a prominent location, such as the meter box or kitchen cupboard. FRAMING 21. Pursuant to Section 70 of the Building Act 1975 work must not start on the frame stage until the following details have been submitted to Urban Certifiers with a Form 15 Design Certificate: e Vergola Roof System — manufacturer's roof system design and layout. 22. Any steel framing must be constructed in accordance with NCC Part 3.4.2 and 3.4.4. 23. All timber framing must be constructed in accordance with NCC Part 3.4.3 and AS1684.2-2010. ROOF & WALL CLADING 24. Gutters and downpipes must be provided in accordance with NCC Part 3.5.2. Gutters must be installed with a minimum fall of 1:500, be suitable supported by brackets at 1.2m centres and have suitable overflow measures. Downpipes must serve no more than 12m of gutter length and be located as close as possible to valley gutters. GLAZING 25. All new glazing is to be supplied and installed in accordance with the requirements of BCA Part 3.6, and relevant parts of AS1288-2006 and/or AS2047-2014. SAFE MOVEMENT & ACCESS 26. All stairs are to be constructed in accordance with NCC Part 3.9.1. Stairs are to have a maximum of 18 rises. Stepped quarter landings must not have more than three winders. Riser openings must not allow a 125 mm sphere to pass through between the treads. The minimum allowed tread dimension is 240 mm, the maximum riser dimension is 190 mm, and the slop relationship (2R&G) is to be between 550-770 mm. All dimensions within the stair flight must be constant throughout. 27. Abalustrade is required to be provided along the side of any stair or floor if its level above the surface beneath is more than 1m. Any required balustrade must be constructed in accordance with NCC Part 3.9.2, so it has a minimum height of 1m and a maximum gap of 125mm. 28. Stairs, ramps and landings must be provided with a suitable slip resistant surface as required by Part 3.9.1.4 of the BCA. Where timber or tiles are used as the finished surface, a certificate of compliance is to be provided. SWIMMING POOL 29. The pool builder must arrange for an inspection of the pool and the pool fence. After a satisfactory inspection, a Form 17 will be issued (or Form 16 for a temporary fence). The pool must not be filled with water until the relevant Form 16 or 17 has been issued. Inspections should be arranged by providing at least 48 hours’ notice and by telephoning (07) 5441 1777 or emailing [email protected]: The pool builder or owner may wish to have the reinforcement of the pool shell inspected by a registered engineer, however this is not a mandatory inspection. 30. Where an aluminium or glass pool fencing is used, a certificate from the manufacturer (or pool fence contractor) confirming the fencing panels comply with the appropriate Australian Standard must be provided prior to the final certificate being issued. The certification should be provided as a Form 15 Design Certificate. 7 AVOCET PARADE, PEREGIAN BEACH PERMIT NO 8140 PAGE 3 OF 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
7 avocet pde.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.