4.1 CONSTRUCTION PHASE
4.1.1 Pollutants
Typical pollutants generated during the construction phase of a development are listed in
Table 4.1 below.
Pollutant Potential Source Priority
Litter Paper, construction packaging, food packaging, High
cement bags, off cuts
Sediment Unprotected exposed soils and stockpiles during High
earthworks and building works
Hydrocarbons Fuel and oil spills, leaks from construction High
equipment and temporary car park areas.
Toxic Materials Cement slurry, asphalt primer, solvents, cleaning Medium
agents, wash waters (e.g. From tile works)
Alkaline Cement slurry and wash waters High
substances
Table 4.1 Typical Construction Phase Pollutants
4.1.2 Potential Impacts
Construction activities can have a potential impact on water quality. Removal of vegetation,
earthworks and changes to drainage patterns can result in erosion and sediment being
washed into waterways. This can impact on the physical-chemical parameters of the
receiving water, decline in the health of aquatic ecosystems, and overall aesthetics.
Potential impacts to the receiving waters surrounding the development site will be
minimized during the construction phase with typical measures as outlined below. These
measures should be adequately detailed on erosion and sediment control plans as part of
the development’s Operational Works application.
4.1.3 Performance Objectives
The amount of runoff traversing and discharging from the site while under construction
should be kept to a minimum. This will restrict soil erosion and mobilisation of sediments
and pollutants through and off the site.
Stormwater runoff at discharge points during the construction phase shall comply with the
objectives detailed in Table A in Appendix 2: Stormwater Management Design Objectives,
Part G, SPP (2017).
4.1.4 Control Measures
The following are typical treatment measures that should be implemented before the
commencement of any construction works. Detailed erosion and sediment control
procedures are to be based on the erosion and sediment control plans lodged at the
Operational Works phase.
Site Based Stormwater Management Plan Page 5 of 20
1856-SBSMP-01_Version 2.0 (April 2019)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.