Original source · versioned page text
Attachment 7- Site Based Stormwater Management Plan
Attached to the e-mail Response to Information Request - RAL18/0023.
Plans and drawings: the text below has words only, no drawings.
Maintenance Maintenance of erosion and control treatment measures (such as sediment fences) will be undertaken if it is observed that they have not been properly installed or the capacity of the measure falls below 75%. Minimise Disturbed Areas Only clear land which will be actively under construction in the near term (e.g. within the next 3-6 months). Stabilise Disturbed Areas Provide temporary stabilisation of disturbed soils whenever active construction is not occurring on a portion of the site. Provide permanent stabilisation during finish grade and landscape the site. Protect Slopes and Channels Safely convey runoff from the top of the slope and stabilise temporary and permanent channel crossings as quickly as possible and ensure that increases in runoff velocity caused by the project do not erode the channel. Diversions of Upslope Runoff To prevent the contamination of clean runoff, upslope runoff should be diverted away from areas of exposed soil. This may be achieved by installing tightly abutting sandbags, creating a ‘sandbag perimeter bank’ to divert flow. Sediment Fences and Inlet Protection Delineate site perimeter to prevent disturbing areas outside the project limits. Sediment fences should be installed around the perimeter of works to ensure contaminated runoff is filtered and sediment is trapped before leaving the site. Sandbags or geofabric should also be placed around/over existing stormwater inlets/grates throughout the site to ensure that any contaminated runoff is filtered before it enters the existing piped stormwater network. Retain Sediment Retain sediment-laden waters from disturbed, active areas within the site. Stabilised Vehicle Entry/Exit Point To minimise the transport of sediment off site, a stabilised entry/exit point should be constructed. All vehicles entering and leaving the site must use this designated entry/exit point. Site Based Stormwater Management Plan Page 6 of 20 1856-SBSMP-01_Version 2.0 (April 2019)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.