Original source · versioned page text
Attachment 7- Site Based Stormwater Management Plan
Attached to the e-mail Response to Information Request - RAL18/0023.
Plans and drawings: the text below has words only, no drawings.
DOCUMENT INFORMATION
Document Title: Site-Based Stormwater Management Plan
Document Reference No. 1856-SBSMP-01 – Version 2.0
Commissioned By: Stockwell Pty Ltd
Prepared By: Barlow Shelley Consulting Engineers Pty Ltd
Author: Vincent Vicic (BEng, GradIEAust)
Reviewed & Authorised By: Cameron Landreth (BEng (Hons), NER, RPEQ)
DOCUMENT CONTROL
Version Date Author Reviewer
1.0 8th March, 2019 Vincent Vicic Cameron Landreth
2.0 17th April, 2019 Vincent Vicic Cameron Landreth
“©2019 Barlow Shelley Consulting Engineers Pty Ltd All Rights Reserved. Copyright in the whole and every part of this
document belongs to Barlow Shelley Consulting Engineers Pty Ltd and may not be used, sold, transferred, copied or
reproduced in whole or in part in any manner or form or in or on any media to any person without the prior written consent
of Barlow Shelley Consulting Engineers Pty Ltd”
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.