Attachment C SDAP Module 10
Attached to the e-mail MCU14/0084 Attachment B (4) Green Roof Plan & Att C - SDAP Module 10 Email 4 of 4.
Performance outcomes Acceptable outcomes Response Comment
impacts to tidal land. (1) is on private land abutting tidal water and used for
Editor’s note: In addressing this performance property access purposes
outcome, the applicant should also have (2) occupies the minimum area reasonably required for
regard to requirements for private marine its designed purpose
development in the prescribed tidal works (3) is not to be roofed or otherwise covered
code in the Coastal Protection and
Management Regulation 2003. (4) does not require the construction of coastal protection
works, shoreline or riverbank hardening or dredging
Editor’s note: Applications should be for marine access
supported by a report certified by an RPEQ to (5) does not adversely impact on public safety or public
demonstrate compliance with this performance access and use of the foreshore.
outcome.
PO2 Development does not result in the No acceptable outcome is prescribed. N/A
disposal of material dredged from an
artificial waterway into coastal waters,
with the exception of:
(1) reclamation works, or
(2) coastal protection works, or
(3) the maintenance of an existing
artificial waterway and the at-sea
disposal of material that has
previously been approved for the
waterway.
PO3 The design and construction of an AO3.1 The design and construction of the artificial N/A
artificial waterway maintains coastal waterway provides for sand bypassing where this is
landforms. necessary to prevent erosion of adjacent coasts and
minimise sedimentation of the waterway.
AND
AO3.2 Clean sand accumulating within an artificial N/A
waterway is returned to the active beach system, in
preference to disposal on land.
PO4 Development that involves dredging AO4.1 A management plan for the development: N/A
includes and complies with a (1) directs the operation of the development
management plan that demonstrates how (2) identifies disposal methods and disposal sites for the
environmental impacts will be managed removed material for the construction and operational
and mitigated, and how the requirements phases of the development
of the National assessment guidelines for (3) outlines how any adverse effects from extraction
dredging, Australia Government activities on sediment transport processes or
Department of the Environment, Water, adjacent coastal landforms will be mitigated or
Heritage and the Arts, 2009 will be met. otherwise remediated by suitably planned and
implemented beach nourishment and rehabilitation
works.
State development assessment provisions Module 10 — Coastal protection 10.1 Tidal works, or development in a coastal management district state code
10 October 2014 V1.5 Page 12 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.