Attachment C SDAP Module 10

Attached to the e-mail MCU14/0084 Attachment B (4) Green Roof Plan & Att C - SDAP Module 10 Email 4 of 4.

of 16

Page text shows just the words. Original shows the document exactly as it was published.

Performance outcomes                      Acceptable outcomes                                                   Response      Comment
                                          Editor’s note: The development should comply with the National
                                          assessment guidelines for dredging, Australian Government
                                          Department of Environment, Water, Heritage and the Arts, 2009.
                                          AND
                                          AO4.2 For land based disposal of dredged material, any                N/A
                                          area used for storing, dewatering, drying or rehandling
                                          dredged material as outlined in the dredge management
                                          plan is:
                                          (1) of sufficient size for the projected volume of dredged
                                              material from relevant capital or maintenance
                                              dredging
                                          (2) protected from future development that would
                                              compromise the use of the area for its intended
                                              purpose of material storage and dewatering.
                                          AND
                                          AO4.3 For at-sea disposal of suitable dredged material,               N/A
                                          the dredge management plan specifies that material is
                                          placed at a dredged material disposal site only if it is
                                          demonstrated that it is not feasible to:
                                          (1) dispose of the material above the high water mark, if
                                               the material is from maintenance works for an
                                               existing artificial waterway for which at-sea disposal
                                               was previously approved, or
                                          (2) keep the dredged material within the active sediment
                                               transport system for the locality, or
                                          (3) use the material for beach nourishment or another
                                               beneficial purpose.
                                          AND
                                          AO4.4 For at-sea disposal of dredged material where the               N/A
                                          marine spoil disposal site is a retentive (i.e. non-
                                          dispersive) site, the disposal site identified in the dredge
                                          management plan has the capacity to hold and retain the
                                          material within its boundaries during construction and
                                          operation of the development.
                                          Editor’s note: The use of dredged material for a beneficial
                                          purpose could include development of port or other marine
                                          facilities, use for construction or industrial purposes, or use to
                                          create or modify land or waters for an approved environmental
                                          outcome (such as creation of a bird roosting site). Further
                                          information about beneficial uses is contained in the National
                                          assessment guidelines for dredging, Australian Government



State development assessment provisions                                        Module 10 — Coastal protection              10.1 Tidal works, or development in a coastal management district state code
10 October 2014 V1.5                                                                                                                                                                 Page 13 of 16
Log in to download the original file

Attachment C SDAP Module 10.pdf · 89 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.