24647 Seaview Tce Enviro Mgmt Plan
Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).
The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn EWSM- 1 EROSION AND SEDIMENT CONTROL (STORMWATER MANAGEMENT)
Version 1
Hierarchy of Control (HOC): 1. Eliminate 2. Substitute 3. Isolate 4. Engineer 5. Admin 6. PPE
Work platforms connected to the Concentrated flow might cause 5 Roof water downpipes (temporary or permanent) should be Hutchinson Builders
stormwater system shall be erosion connected to the stormwater drainage system immediately after the Foreman
maintained in good order and roof is laid.
cleaned frequently of
sediment/debris which may enter Workers
the system Inappropriate and ineffective 5 Sediment control devices must be de-silted and made fully Hutchinson Builders
sediment control measures operational as soon as reasonable and practicable after a sediment- Foreman
producing event, whether natural or artificial, if the device's sediment
retention capacity falls below 75% of its design retention capacity.
Workers
Inappropriate and ineffective 5 Sediment fence is buried in 200mm deep. Along the lower side of the Hutchinson Builders
sediment fence trench, appropriately secure the stakes into the ground spaced no Foreman
greater than 3m if supported by a top support wire or weir mesh
backing, otherwise no greater than 2m
Workers
In areas where it is impractical to bury the lower edge of the sediment
fence, the lower 200 mm (min) portion of the fabric should be placed
on the ground up-slope of the fence and buried under a 100 mm (min)
layer of coarse aggregate (20-40 mm)
Sediment fences should be located down-slope of the disturbance,
and ideally along a line of constant land level to prevent the
concentration of stormwater run-off. Where this cannot be achieved
then sections of the sediment fence should have ‘returns’ directed up
slope for 1-2 metres to control the concentration of stormwater run-
off
Replace sediment fences if the fabric is ripped or otherwise damaged.
The maintenance of sediment fences includes the removal of
sediment deposited up-slope of the fence and, where necessary, re-
trenching the fabric and ensuring posts are firmly secured in the
ground HSE Advisor
If excessive sediment build-up occurs, reapply crushed rock to the
entry/exit pad.
Daily check on sediment fence
Trenching Sediment-laden water ponding on 5 No more than 150m of a stormwater, sewer line or other service Site Manager
site trench must to be open at any one time.
Where it is practical, trench needs to be backfilled when the
significant event is forecasted
3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.