24647 Seaview Tce Enviro Mgmt Plan

Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).

of 212

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
9.           Corrective and Preventative Action
An environmental incident with respect to the ESCP is defined as any occurrence where sediment is
released from the site, whether controlled or uncontrolled, or where storm water is released (controlled)
from site which does not meet the water quality requirements.

All incidents and non-conformances are to be reported, investigated and corrected in accordance with the
ESCP to ensure effective soil and water quality management practices at all times.
Best practice site management requires all ESC measures to be inspected by the Contractors nominated
representative at least daily when rain is occurring, within 24 hours prior to expected rainfall, and within 18
hours of a rainfall event of sufficient intensity and duration to cause onsite runoff (IECA, 2008). Such
inspections must check:

        Daily site inspections (during periods of runoff producing rainfall)
              All drainage, erosion and sediment control measures
              Occurrences of excessive sediment deposition (whether on-site or off-site)
              All site discharge points (including dewatering activities as appropriate)


        Weekly site inspections (even if work is not occurring on-site)
            All drainage, erosion and sediment control measures
            Occurrences of excessive sediment deposition (whether on-site or off-site)
            Occurrences of construction materials, litter or sediment placed, deposited, washed or
                blown from the site, including deposition by vehicular movements
            Litter and waste receptors
            Oil, fuel and chemical storage facilities


        Prior to anticipated runoff producing rainfall
              All drainage, erosion and sediment control measures
              All temporary flow diversion and drainage works


        Following runoff producing rainfall
              All drainage, erosion and sediment control measures
              Occurrences of excessive sediment deposition (whether on-site or off-site)
              Occurrences of construction materials, litter or sediment placed, deposited, washed or
                blown from the site, including deposition by vehicular movements




71 Seaview Terrace, Sunshine Beach - Erosion and Sediment Control Plan                                  Page 10

Hutchinson Builders
17SUN-0024/1600102
Log in to download the original file

24647 Seaview Tce Enviro Mgmt Plan.pdf · 18.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.