24647 Seaview Tce Enviro Mgmt Plan
Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).
The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn9. Corrective and Preventative Action
An environmental incident with respect to the ESCP is defined as any occurrence where sediment is
released from the site, whether controlled or uncontrolled, or where storm water is released (controlled)
from site which does not meet the water quality requirements.
All incidents and non-conformances are to be reported, investigated and corrected in accordance with the
ESCP to ensure effective soil and water quality management practices at all times.
Best practice site management requires all ESC measures to be inspected by the Contractors nominated
representative at least daily when rain is occurring, within 24 hours prior to expected rainfall, and within 18
hours of a rainfall event of sufficient intensity and duration to cause onsite runoff (IECA, 2008). Such
inspections must check:
Daily site inspections (during periods of runoff producing rainfall)
All drainage, erosion and sediment control measures
Occurrences of excessive sediment deposition (whether on-site or off-site)
All site discharge points (including dewatering activities as appropriate)
Weekly site inspections (even if work is not occurring on-site)
All drainage, erosion and sediment control measures
Occurrences of excessive sediment deposition (whether on-site or off-site)
Occurrences of construction materials, litter or sediment placed, deposited, washed or
blown from the site, including deposition by vehicular movements
Litter and waste receptors
Oil, fuel and chemical storage facilities
Prior to anticipated runoff producing rainfall
All drainage, erosion and sediment control measures
All temporary flow diversion and drainage works
Following runoff producing rainfall
All drainage, erosion and sediment control measures
Occurrences of excessive sediment deposition (whether on-site or off-site)
Occurrences of construction materials, litter or sediment placed, deposited, washed or
blown from the site, including deposition by vehicular movements
71 Seaview Terrace, Sunshine Beach - Erosion and Sediment Control Plan Page 10
Hutchinson Builders
17SUN-0024/1600102
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.