24647 Seaview Tce Enviro Mgmt Plan
Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).
The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnList of Referenced Legislation & Codes of Practice – Environment
HB-HSEQ-F-005-A Version 5
Issues Applicable Legislation / Guidelines / Standards Regulating Major Requirements Of Legislation
Authority
Erosion and sediment Protection of the Environment Operations Act 1997 NSW EPA Must not deposit sand, soil, silt or mud—
control - in a roadside gutter, stormwater drain or a water; or
Best Practice Erosion & Sediment Control 2008Best - in a place where it could move or be washed into a roadside gutter, or
Practice Erosion & Sediment Control 2008 stormwater drain
Local council can develop environmental plans to manage erosion and
sediment erosion issues. Check with the appropriate local council for
further details
Minimisation of erosion and control of sediment in all construction
activities.
Use of erosion control matting to minimise soil erosion on steep slopes
and for highly erosive soils.
Stabilised entry and exit points to minimise tracking of sediment offsite.
Sediment control for service trenches.
Preserve as much soil cover (grass, leaf litter, gravel and erosion control
mats) as possible.
Maintain kerb vegetation where practicable to filter out sediment
Commence earthworks immediately prior to building.
Topsoil should be stockpiled (with cover) for later use.
Building materials should be located within the sediment control zone.
A perimeter bank may be required upslope of a stockpile.
Waste Management
Disposal of waste from Protection of the Environment Operations (Waste) NSW EPA Outlines the requirements of a waste management program such as the
building sites Regulations 2005 activities that may generate waste
Management of Protection of the Environment Operations (Waste) NSW EPA Minimisation of waste generated
Excavated Material Regulations 2005 Ensure the correct storage of waste and segregation of different waste
materials.
A waste management program may be required as part of the
development approval conditions.
Protect the environment through the minimising the amount of
excavation required.
Use excavated material as backfill.
Where large excavation is required, stockpile topsoil and replace on
completion of works.
A specific site rehabilitation program may need to be followed
HUTCHINSON BUILDERS 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.