Appendix B - Global Stability Assessment Report
Attached to the e-mail Operational Works Application - DA Form 1 - Town Planning Report - Global Stability Assessment Report - Earthworks Compaction Report - Erosion and Sediment Control Plan - 36 Tunba Court Cooroy Mountain.
The original of this document is very large (10.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
-6-
Job No: ME21/032
Site Photo 9: Drainage channels at the toe of the Site Photo 10: The beginnings of a swale near the
cut batter crest of the cut batter
Site Photo 11: Evidence of water channels and Site Photo 12: Evidence of ponding water in the
tunnels beginning in the cut batter drainage channels at the toe of the cut batter
Site Photo 13: Crest of the fill batter without Site Photo 14: Silt fence along the crest of the gully
drainage channels line – north west of the platform
Ref: 27222-rev 1 MORRISON GEOTECHNIC
Mr Geoff Hussin
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.