Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2022-08-15 General Committee Meeting Agenda

of 122

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (21.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   15 AUGUST 2022




                                    Page 92 of 122

GENERAL COMMITTEE MEETING AGENDA                                                        15 AUGUST 2022

     Corporate Plan Key  Operational Initiatives       Outcomes                    Responsible    Update                                        Status Q3     er.)
     Focus Areas                                                                   Areas/Officers
                         Asset management renewal | Maintenance of assets to       Asset Planning/ | Delivery of Shire Level 3 Bridge and Structure Ontrack | Completed
                         program                       required standards and      Asset Planning condition assessments currently underway.
                                                       achievement of sustainable | Coordinator | shire reseal program completed for 2021/22.
                                                       outcomes in safety,
                                                       minimising lifecycle and                   Shire Stormwater CCTV Condition Assessment
                                                       project delivery costs                     program underway.

                         Noosa Heads Parade Corridor| Improve community            Infrastructure Noosa Parade corridor upgrade;                Ontrack | Ontrack
                         storm water drainage upgrade} connectivity and create a  Planning,       Stage 1 works have been completed;
                                                       collective vision. Foster   Design &       Stage 2 - Laguna Dr to Ravenwood Dr has
                                                       successful social networks | Delivery/     commenced:
                                                       aoe oe ee                   Infrastructure | stage 3 - Ravenwood Dr to Garth Prowd bridge,
                                                       eee      eels               Seen           commences mid July 2022.
                                                                                   Felvee Mar     Overall completion forecast 31 Oct 2022 prior to
                                                                                         ys       Triathlon event.

                                                                                           Page 92 of 122
Log in to download the original file

2022-08-15 General Committee Meeting Agenda(PDF, 20MB).pdf · 21.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.