MCU10/2083 Development Application part 2 - Attachment 7 - Stormwater Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn
5.0 OPERATIONALPHASEWATERQUALITYMANAGEMENT
5.1 INTRODUCTION
Inrecentyearstherehavebeenanincreasingnumberofinitiativestomanagetheurbanwatercycleinamore
sustainable way. The integration of the urban water cycle within the concept of Ecologically Sustainable
Development(ESD)istermedWaterSensitiveUrbanDesign(WSUD).AWSUDtreatmenttrainconsistingofthree
separate bioretention systems / rain gardens has been proposed to treat all stormwater flows from the
operationalphaseofthedevelopment.
5.2 POLLUTANTS
Pollutantstypicallygeneratedbyduringtheoperationalphaseofthedevelopmentareshownbelow(GoldCoast
CityCouncil,2005).
Table9–OperationalPhasePollutantSources
Pollutant PotentialSource
Construction packaging, construction
Litter
wastematerials,paper,foodpackaging
Sediment Exposedsoilsandstockpiles
Oxygendemandingsubstances
Organicorchemicalmatter
(organic&chemicalmatter)
Nutrients Nitrogen,phosphorus
Pathogens/Faecalcoliforms
Sewage
(bacteria&viruses)
Heavymetals(oftenassociated
Sedimentrunoff
withfinesediment)
Surfactants(eg.detergentsfrom
Detergents,cleansingagents
carwashing)
5.3 OBJECTIVES
Table 10 outlines the stormwater pollutant reductions required for the subject site as stipulated within the
Healthy Waterways ‘Water Sensitive Urban Design Technical Design Guidelines for South East Queensland –
Version1’.TheobjectivesdetailedinTable10alsocomplywiththeoutcomesoftheWaterSensitiveDesignCode
oftheSunshineCoastRegionalCouncil(NoosaPlan).
Table10OperationalPhaseWaterQualityObjectives
Pollutant PollutantReduction
SuspendedSolids 80%
TotalPhosphorus 60%
TotalNitrogen 45%
SITEBASEDSTORMWATERMANAGEMENTPLAN–RevisionD 37GibsonRoad,Noosaville Page 10
[OCR of page images]
JF
AU
URBANCONSULTANTS
5.1 INTRODUCTION
In recent years there have been an increasing number of initiatives to manage the urban water cycle in a more
sustainable way. The integration of the urban water cycle within the concept of Ecologically Sustainable
Development (ESD) is termed Water Sensitive Urban Design (WSUD). A WSUD treatment train consisting of three
separate bio-retention systems / rain gardens has been proposed to treat all stormwater flows from the
operational phase of the development.
5.2. POLLUTANTS
Pollutants typically generated by during the operational phase of the development are shown below (Gold Coast
City Council, 2005).
Table 9 — Operational Phase Pollutant Sources
Pollutant Potential Source
Litt Construction packaging, construction
itter
waste materials, paper, food packaging
Sediment Exposed soils and stockpiles
Oxygen demanding substances . .
. . Organic or chemical matter
(organic & chemical matter)
Nutrients Nitrogen, phosphorus
Pathogens / Faecal coliforms
. . Sewage
(bacteria & viruses)
Heavy metals (often associated .
a ; Sediment runoff
with fine sediment)
Surfactants (eg. detergents from .
Detergents, cleansing agents
car washing)
5.3 OBJECTIVES
Table 10 outlines the stormwater pollutant reductions required for the subject site as stipulated within the
Healthy Waterways ‘Water Sensitive Urban Design Technical Design Guidelines for South East Queensland —
Version 1’. The objectives detailed in Table 10 also comply with the outcomes of the Water Sensitive Design Code
of the Sunshine Coast Regional Council (Noosa Plan).
Table 10 - Operational Phase Water Quality Objectives
Pollutant Pollutant Reduction
Suspended Solids 80%
Total Phosphorus 60%
Total Nitrogen 45%
SITE BASED STORMWATER MANAGEMENT PLAN ~ Revision D 37 Gibson Road, Noosaville 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.