Table8ConstructionPhasePerformanceCriteria
Pollutant PotentialSource
TotalSuspendedSolids 90thPercentile<50mg/L
pH 6.5–9.0
DissolvedOxygen 90thPercentile>80%saturationor6mg/L
Hydrocarbons Novisiblesheenonreceivingwaters
Litter Novisiblelitterwashedfromsite
4.4 MONITORINGANDMAINTENANCE
Thegeneralrequirementofmonitoringduringtheconstructionphasewillbe:
Workactivitiesarerestrictedtodesignatedconstructionareas
EarthworksandsiteclearingareundertakeninaccordancewiththeErosionandSedimentControlPlans
Erosionandsedimentcontroldevicesaretobeconstructed/installedinaccordancewiththeErosionand
SedimentControlPlans
Inspectionofsedimentfencesanderosionandsedimentcontrolstructures/devicesonaweeklybasisas
wellasafteranyraineventexceeding25mmin24hrs
Stormwaterdischargesfromthesitearenothavinganyadverseaffectonthedownstreamenvironment
Monitoring and recording of the performance of the drainage control devices including water quality
testingwhererequired
Any failure in the stormwater system shall be immediately rectified to prevent uncontrolled discharge
fromthesite
Any failure to the stormwater system causing damage to surroundings should implement immediate
remedialworktothedamagedarea
4.5 RESPONSIBILITYANDREPORTING
Thecontractorshallberesponsibleformonitoringtheperformanceofalldrainagecontrolanderosion
andsedimentcontroldevices
RecordsofanyfailurestodevicesshouldbekeptandreportedtotheConstructionManager
RegularinspectionsofthedevicesshallbereportedtotheConstructionManager
InspectionsofthedevicesafterheavyrainfallshallbereportedtotheConstructionManager
SITEBASEDSTORMWATERMANAGEMENTPLAN–RevisionD 37GibsonRoad,Noosaville Page 9
[OCR of page images]
4.4
JF
AU
URBANCONSULTANTS
Table 8 - Construction Phase Performance Criteria
Pollutant Potential Source
Total Suspended Solids 90" Percentile < 50mg/L
pH 6.5-9.0
Dissolved Oxygen 90" Percentile > 80% saturation or 6mg/L
Hydrocarbons No visible sheen on receiving waters
Litter No visible litter washed from site
MONITORING AND MAINTENANCE
The general requirement of monitoring during the construction phase will be:
4.5
Work activities are restricted to designated construction areas
Earthworks and site clearing are undertaken in accordance with the Erosion and Sediment Control Plans
Erosion and sediment control devices are to be constructed/installed in accordance with the Erosion and
Sediment Control Plans
Inspection of sediment fences and erosion and sediment control structures/devices on a weekly basis as
well as after any rain event exceeding 25mm in 24hrs
Stormwater discharges from the site are not having any adverse affect on the downstream environment
Monitoring and recording of the performance of the drainage control devices including water quality
testing where required
Any failure in the stormwater system shall be immediately rectified to prevent uncontrolled discharge
from the site
Any failure to the stormwater system causing damage to surroundings should implement immediate
remedial work to the damaged area
RESPONSIBILITY AND REPORTING
The contractor shall be responsible for monitoring the performance of all drainage control and erosion
and sediment control devices
Records of any failures to devices should be kept and reported to the Construction Manager
Regular inspections of the devices shall be reported to the Construction Manager
Inspections of the devices after heavy rainfall shall be reported to the Construction Manager
SITE BASED STORMWATER MANAGEMENT PLAN — Revision D 37 Gibson Road, Noosaville 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.